The HT BTES plant in Emmaboda Report from the first three years of operation 2010-2013
暂无分享,去创建一个
The Emmaboda HT-BTES was taken into operation 2010. Since then ~10 GWh has been stored, only a fraction has been extracted, and a storage temperature of 40-45 oC has been reached. The purpose of th ...
[1] Bo Nordell,et al. Borehole heat store design optimization , 1994 .