Managing Health Care Projects in Hong Kong: A Case Study of the North District Hospital

Abstract The difficulties of coordinating end-user requirements and minimising subsequent changes, with the consequent delays and unforeseen extra costs, have been a feature of hospital procurement. Several successful cases to procure hospitals more quickly and less expensively by using alternative procurement systems are employed in U.K. This paper examines the characteristics and difficulties in running health care projects. By way of a detailed case study, the latest state-of-the-art approach, such as adopting the enhanced design and build system, well-defined project management system, partnering and value management, in managing a health care project in Hong Kong is presented and analysed. It also compares and contrasts the distinctive features of the enhanced design and build system and the pure design and build system.

[1]  Mei-mai Anita. Liu,et al.  Evaluation of the outcome of construction projects , 1995 .

[2]  Michael Coyle,et al.  Critical Success Factors for Construction Projects , 1992 .

[3]  Albert P.C. Chan,et al.  Construction process reengineering: a case study , 1999 .

[4]  Albert P.C. Chan,et al.  Framework of Success Criteria for Design/Build Projects , 2002 .

[5]  J. Pinto,et al.  Variations in Critical Success Factors Over the Stages in the Project Life Cycle , 1988 .

[6]  Albert P.C. Chan Evaluation of enhanced design and build system a case study of a hospital project , 2000 .

[7]  Anthony C. Sidwell,et al.  A critical study of project team organisational forms within the building process , 1982 .

[8]  L. Burns,et al.  Vehicle of change. , 2002, Scientific American.

[9]  J. Masterman An Introduction to Building Procurement Systems , 1990 .

[10]  Issaka Ndekugri,et al.  Building Procurement by Design and Build Approach , 1994 .

[11]  Francis Tekyi Edum-Fotwe,et al.  Introduction to Building Procurement Systems , 2002 .

[12]  D Walker Investigation into factors that determine building construction time performance , 1994 .

[13]  Alistair G.F. Gibb Maintain control or delegate responsibility? The design development dilemma at construction interfaces , 1995 .

[14]  Anthony Walker,et al.  Project Management in Construction , 1984 .

[15]  Vernon Ireland,et al.  The role of managerial actions in the cost, time and quality performance of high-rise commercial building projects , 1985 .

[16]  R. A. Mohsini,et al.  Determinants of performance in the traditional building process , 1992 .

[17]  Jeffrey K. Pinto,et al.  Critical factors in successful project implementation , 1987, IEEE Transactions on Engineering Management.