Multiobjective Management of Erection for Cablestayed Bridge Using Satisficing Trade-Off Method

In the erection phases of cable stayed bridges, the distance between the anchorage points of each cable is adjusted (called a shim adjustment) to agree the cable tension and the fracture configuration (camber) of bridges with the design values in their erection phases.