A new study of assembly scheduling effective constraint method in assembly planning
暂无分享,去创建一个
Hui Chen | Qiang Wang | Yu Meng | Shilei Li
[1] D. P. Songa,et al. Product due date assignment for complex assemblies , 2002 .
[2] P. D. D. Dominic,et al. Efficient dispatching rules for dynamic job shop scheduling , 2003 .
[3] Li-Chen Fu,et al. Solving the FMS scheduling problem by critical ratio-based heuristics and the genetic algorithm , 2004, IEEE International Conference on Robotics and Automation, 2004. Proceedings. ICRA '04. 2004.
[4] Chandrasekharan Rajendran,et al. Dispatching rules for scheduling in assembly jobshops - Part 1 , 2000 .
[5] Chandrasekharan Rajendran,et al. Scheduling rules for dynamic shops that manufacture multi-level jobs , 2003 .
[6] B. K. Choi,et al. Dispatching rules for dynamic scheduling of one-of-a-kind production , 2006, Int. J. Comput. Integr. Manuf..