Logistics scheduling with batching and transportation
暂无分享,去创建一个
[1] George L. Vairaktarakis,et al. Integrated Scheduling of Production and Distribution Operations , 2005, Manag. Sci..
[2] TransportationConsiderationsChung,et al. Machine Scheduling with Transportation Considerations , 2000 .
[3] Kenneth Steiglitz,et al. Combinatorial Optimization: Algorithms and Complexity , 1981 .
[4] Michael Pinedo,et al. Scheduling: Theory, Algorithms, and Systems , 1994 .
[5] Chung Yee Lee,et al. Two-stage Logistics Scheduling with Two-mode Transportation , 2003 .
[6] Chung Yee Lee,et al. On scheduling to minimize earliness-tardiness and batch delivery costs with a common due date , 1993 .
[7] Chris N. Potts,et al. Supply chain scheduling: Batching and delivery , 2003, Oper. Res..
[8] Chris N. Potts,et al. Scheduling with Fixed Delivery Dates , 2001, Oper. Res..
[9] T. C. Edwin Cheng,et al. Single machine scheduling with batch deliveries , 1996 .
[10] Susanne Albers,et al. The Complexity of One-Machine Batching Problems , 1993, Discret. Appl. Math..
[11] Hirofumi Matsuo. The Weighted Total Tardiness Problem with Fixed Shipping Times and Overtime Utilization , 1988, Oper. Res..
[12] Chung-Lun Li,et al. Machine scheduling with deliveries to multiple customer locations , 2005, Eur. J. Oper. Res..
[13] Ameur Soukhal,et al. Complexity of flow shop scheduling problems with transportation constraints , 2005, Eur. J. Oper. Res..
[14] D. Atkin. OR scheduling algorithms. , 2000, Anesthesiology.
[15] Klaus H. Ecker,et al. Scheduling Computer and Manufacturing Processes , 2001 .
[16] Zhi-Long Chen,et al. Scheduling and common due date assignment with earliness-tardiness penalties and batch delivery costs , 1996 .