A Neural Network Mark-up Estimation Model for Syrian Contractors

One of the most important decisions that have to be made by construction contractors is how much to mark-up the estimated cost of a new project. The main objectives of this paper are to model the relationship between mark-up estimation and the key factors affecting it and to compare the application of regression analysis and neural network techniques on the mark-up decision making process in order to find which technique is more reliable in terms of accuracy and robustness. The most influential mark-up factors were identified through a formal questionnaire survey conducted among Syrian contractors. Subsequently, data on one hundred and eleven real-life bidding situations was collected from Syria. Ninety-six of these projects were used to develop linear, non-linear regression and neural network mark-up models. The remaining fifteen projects were randomly held-back for validating the developed models. The neural network model proved to be robust and more accurate than the regression models. Although this study was carried out in the context of the Syrian construction industry, the methodology and the findings have much broader geographical applicability.

[1]  L. Friedman A Competitive-Bidding Strategy , 1956 .

[2]  Irtishad Ahmad,et al.  Optimum mark-up for bidding: a preference-uncertainty trade off approach , 1987 .

[3]  W. Warde,et al.  Statistical Methods: An Introductory Text , 1995 .

[4]  Martin Skitmore,et al.  The effect of contract type and size on competitiveness in bidding , 1997 .

[5]  Mohammed Wanous,et al.  To bid or not to bid: a parametric solution , 2000 .

[6]  Neal B. H. Benjamin,et al.  Comparison of Friedman and Gates Competitive Bidding Models , 1979 .

[7]  Marvin Gates GATES' BIDDING MODEL--A MONTE CARLO EXPERIMENT , 1976 .

[8]  Irem Dikmen,et al.  A case-based decision support tool for bid mark-up estimation of international construction projects , 2007 .

[9]  M. Wanous,et al.  TENDERING FACTORS CONSIDERED BY SYRIAN CONTRACTORS , 1998 .

[10]  Abdulrezak N. Mohamed,et al.  SCBMD: A knowledge-based system software for strategically correct bid/no bid and mark-up size decisions , 2008 .

[11]  A. Halim Boussabaine,et al.  The use of artificial neural networks in construction management: a review , 1996 .

[12]  Gul Polat,et al.  Mark-up Size Estimation in Railway Projects using the Integration of AHP and Regression Analysis Techniques☆ , 2015 .

[13]  Irtishad U. Ahmad Bidding strategy : multicriteria decision-making approach , 1988 .

[14]  A. Shash Factors considered in tendering decisions by top UK contractors , 1993 .

[15]  Irtishad Ahmad,et al.  Questionnaire Survey on Bidding in Construction , 1988 .

[16]  Mohammed Abdel Razek,et al.  A Neural Network Model for Construction Projects Site Overhead Cost Estimating in Egypt , 2011, ArXiv.

[17]  Martin Skitmore,et al.  Strategic information requirements in contract bidding : Framework for development of a decision support system , 1996 .

[18]  Tarek Hegazy,et al.  Neural networks as tools in construction , 1991 .

[19]  Will Hughes,et al.  Risk and Price in the Bidding Process of Contractors , 2011 .

[20]  P. G. Ioannou Bidding Models — Symmetry and State of Information , 1988 .

[21]  Gary Milton Broemser,et al.  Competitive bidding in the construction industry , 1968 .