A hybrid model for a multiproduct pipeline planning and scheduling problem
暂无分享,去创建一个
[1] Eduardo Camponogara,et al. A-teams para um problema de transporte de derivados de petroleo , 1995 .
[2] Ruy Luiz Milidiú,et al. The complexity of makespan minimization for pipeline transportation , 2003, Theor. Comput. Sci..
[3] Jimmy Ho-Man Lee,et al. Increasing Constraint Propagation by Redundant Modeling: an Experience Report , 1999, Constraints.
[4] Roger L. Wainwright,et al. Scheduling of multi-product fungible liquid pipelines using genetic algorithms , 1999, SAC '99.
[5] Eric Horvitz,et al. Dynamic restart policies , 2002, AAAI/IAAI.
[6] R. Milidiú,et al. Pipesworld : Planning Pipeline Transportation of Petroleum Derivatives ∗ , 2003 .
[7] A. Herrán,et al. Multiobjective optimization of the transport in oil pipelines networks , 2003, EFTA 2003. 2003 IEEE Conference on Emerging Technologies and Factory Automation. Proceedings (Cat. No.03TH8696).
[8] Jaime Cerdá,et al. Optimal scheduling of multiproduct pipeline systems using a non-discrete MILP formulation , 2004, Comput. Chem. Eng..
[9] R A Wilson. TRANSPORTATION IN AMERICA 2000: STATISTICAL ANALYSIS OF TRANSPORTATION IN THE UNITED STATES. EIGHTEENTH EDITION WITH HISTORICAL COMPENDIUM 1939-1999 , 2001 .
[10] John N. Hooker,et al. Integrated methods for optimization , 2011, International series in operations research and management science.
[11] José M. Pinto,et al. Efficient MILP formulations and valid cuts for multiproduct pipeline scheduling , 2004, Comput. Chem. Eng..
[12] José M. Pinto,et al. Scheduling of a multiproduct pipeline system , 2003, Comput. Chem. Eng..
[13] S. Ramani,et al. PIPES: A heuristic search model for pipeline schedule generation , 1997, Knowl. Based Syst..
[14] Lúcia Valéria Ramos de Arruda,et al. A Mixed Integer Programming Approach for Scheduling Commodities in a Pipeline , 2002 .
[15] Cid C. de Souza,et al. Planning and Scheduling the Operation of a Very Large Oil Pipeline Network , 2008, CP.
[16] Ruy Luiz Milidiú,et al. Pipeline Transportation of Petroleum Products with No Due Dates , 2002, LATIN.
[17] A. Barbosa‐Póvoa,et al. Pipeline Scheduling and Inventory Management of a Multiproduct Distribution Oil System , 2006 .
[18] José M. Pinto,et al. A novel continuous time representation for the scheduling of pipeline systems with pumping yield rate constraints , 2008, Comput. Chem. Eng..
[19] Peter J. Stuckey,et al. Programming with Constraints: An Introduction , 1998 .
[20] John N. Hooker. Integrated Methods for Optimization (International Series in Operations Research & Management Science) , 2006 .
[21] A. Barbosa‐Póvoa,et al. Reactive Scheduling Framework for a Multiproduct Pipeline with Inventory Management , 2007 .
[22] A. Herrán-González,et al. Hybrid heuristic and mathematical programming in oil pipelines networks: Use of immigrants , 2005 .
[23] Ana Paula Barbosa-Póvoa,et al. Pipeline scheduling and distribution centre management—A real-world scenario at CLC , 2006 .
[24] Lúcia Valéria Ramos de Arruda,et al. Using CLP and MILP for scheduling commodities in a pipeline , 2005 .
[25] Cid C. de Souza,et al. Heuristics and Constraint Programming Hybridizations for a Real Pipeline Planning and Scheduling Problem , 2008, 2008 11th IEEE International Conference on Computational Science and Engineering.