Determining the Vulnerabilities of the Power Transmission System

Determining the vulnerabilities in power transmission systems requires two distinct steps because most large blackouts have two distinct parts, the triggers/initiating event followed by the cascading failure. Finding the important triggers for large blackouts is the first and standard step. Next, the cascading part of the extreme event (which can be long or short) is critically dependent on the "state" of the system, how heavily the lines are loaded, how much generation margin exists, and where the generation exists relative to the load. However, during large cascading events there are some lines whose probability of overloading is higher that the others. Statistical studies of blackouts using the OPA code allow the identification of such lines or groups of line for a given network model, thereby providing a technique for identifying at risk (or critical) clusters. This paper addresses both parts of the vulnerability question.

[1]  Ian Dobson,et al.  Exploring Complex Systems Aspects of Blackout Risk and Mitigation , 2011, IEEE Transactions on Reliability.

[2]  Ian Dobson,et al.  Evidence for self-organized criticality in a time series of electric power system blackouts , 2004, IEEE Transactions on Circuits and Systems I: Regular Papers.

[3]  Hui Ren,et al.  Long-Term Effect of the n-1 Criterion on Cascading Line Outages in an Evolving Power Transmission Grid , 2008, IEEE Transactions on Power Systems.

[4]  B A Carreras,et al.  Complex dynamics of blackouts in power transmission systems. , 2004, Chaos.

[5]  Benjamin A. Carreras,et al.  Number and propagation of line outages in cascading events in electric power transmission systems , 2010, 2010 48th Annual Allerton Conference on Communication, Control, and Computing (Allerton).

[6]  Benjamin A Carreras,et al.  Complex systems analysis of series of blackouts: cascading failure, critical points, and self-organization. , 2007, Chaos.

[7]  A S Landsberg,et al.  Behavior of coupled automata. , 2004, Physical review. E, Statistical, nonlinear, and soft matter physics.

[8]  Ian Dobson,et al.  Risk Assessment in Complex Interacting Infrastructure Systems , 2005, Proceedings of the 38th Annual Hawaii International Conference on System Sciences.