Impact of correlation and induced correlation on the estimation of project cost of buildings
暂无分享,去创建一个
[1] Hugh G. Campbell. Matrices With Applications , 1968 .
[2] Wayne S. Smith,et al. Interactive Elicitation of Opinion for a Normal Linear Model , 1980 .
[3] G. Gregory. The Evaluation of Risk in Business Investment , 1981 .
[4] Hon-Shiang Lau,et al. A Four-Moments Alternative to Simulation for a Class of Stochastic Management Models , 1982 .
[5] J. Schmee. Matrices with Applications in Statistics , 1982 .
[6] J. Perry,et al. RISK AND ITS MANAGEMENT IN CONSTRUCTION PROJECTS. , 1985 .
[7] Roger Flanagan,et al. Life cycle costing and risk management , 1987 .
[8] Colin M. Sorrill. Risk Analysis for Large Projects: Models, Methods and Cases , 1987 .
[9] 石谷 久. Risk Analysis for Large Projects-Models, Methods & Cases. Dale Cooper & Chris Chapman著 John Wiley & Sons.(1987) , 1988 .
[10] Ali Jaafari. Project Viability and Economic Risk Analysis , 1988 .
[11] E. Ziegel. Introduction to the Theory and Practice of Econometrics , 1989 .
[12] Alan D. Russell,et al. Analytical approach for economic risk quantification of large engineering projects , 1992 .
[13] Ali Touran,et al. Monte Carlo Technique with Correlated Random Variables , 1992 .
[14] M. Ranasinghe,et al. TREATMENT OF CORRELATION FOR RISK ANALYSIS OF ENGINEERING PROJECTS , 1992 .
[15] A. Touran. Probabilistic Cost Estimating with Subjective Correlations , 1993 .
[16] Malik Ranasinghe,et al. Contingency allocation and management for building projects , 1994 .
[17] Kwong Wing Chau,et al. Monte Carlo simulation of construction costs using subjective data , 1995 .
[18] David M. Wall,et al. Distributions and correlations in Monte Carlo simulation , 1997 .