Reconstruction of a 1920's Steel-Framed Office Building 68 King William Street, London EC4

An example of the difficult problems that can be faced in this type of work: constricted location, adjacent listed buildings, elaborate temporary works, three party walls, facade rebuilds, transfer structures, Interfaces with existing work, and location over a railway tunnel. 400 tonnes of existing steelwork was retained.