Scheduling a deteriorating maintenance activity on a single machine
暂无分享,去创建一个
[1] J. M. Moore. An n Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs , 1968 .
[2] S. S. Panwalkar,et al. Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem , 1982, Oper. Res..
[3] Eric Sanlaville,et al. Machine scheduling with availability constraints , 1998, Acta Informatica.
[4] Zhi-Long Chen,et al. Scheduling jobs and maintenance activities on parallel machines , 2000 .
[5] C.-Y. Lee,et al. Machine scheduling with a rate-modifying activity , 2001, Eur. J. Oper. Res..
[6] Gur Mosheiov,et al. New Results On Sequencing With Rate Modification , 2003 .
[7] Chung-Yee Lee,et al. Machine Scheduling with Availability Constraints , 2004, Handbook of Scheduling.
[8] Bertrand M. T. Lin,et al. A concise survey of scheduling with time-dependent processing times , 2004, Eur. J. Oper. Res..
[9] Vitaly A. Strusevich,et al. Planning Machine Maintenance in Two-Machine Shop Scheduling , 2006, Oper. Res..
[10] L. Steg,et al. Conclusions and Directions of Further Research , 2008 .
[11] Harold W. Kuhn,et al. The Hungarian method for the assignment problem , 1955, 50 Years of Integer Programming.