An adjustable robust optimization approach for contingency-constrained transmission expansion planning
暂无分享,去创建一个
Alexandre Street | Alexandre Moreira | Jose Manuel Arroyo | J. Arroyo | A. Street | Alexandre Moreira
[1] Rahmat-Allah Hooshmand,et al. Comprehensive review of generation and transmission expansion planning , 2013 .
[2] J. Contreras,et al. A Three-Level Static MILP Model for Generation and Transmission Expansion Planning , 2013, IEEE Transactions on Power Systems.
[3] A. Ben-Tal,et al. Adjustable robust solutions of uncertain linear programs , 2004, Math. Program..
[4] I. Dobson,et al. Investment Planning for Electric Power Systems Under Terrorist Threat , 2010, IEEE Transactions on Power Systems.
[5] Natalia Alguacil,et al. A trilevel programming approach for electric grid defense planning , 2014, Comput. Oper. Res..
[6] M. V. F. Pereira,et al. A New Benders Decomposition Approach to Solve Power Transmission Network Design Problems , 2001, IEEE Power Engineering Review.
[7] Jaeseok Choi,et al. Transmission Expansion Planning Using Contingency Criteria , 2007, IEEE Transactions on Power Systems.
[8] Han Yu,et al. Robust Transmission Network Expansion Planning Method With Taguchi's Orthogonal Array Testing , 2011, IEEE Transactions on Power Systems.
[9] J. M. Arroyo,et al. Contingency-Constrained Unit Commitment With $n - K$ Security Criterion: A Robust Optimization Approach , 2011, IEEE Transactions on Power Systems.
[10] G. Latorre,et al. Classification of publications and models on transmission expansion planning , 2003 .
[11] M. Carrion,et al. Vulnerability-Constrained Transmission Expansion Planning: A Stochastic Programming Approach , 2007, IEEE Transactions on Power Systems.
[12] K. Morison,et al. Power system security assessment , 2004, IEEE Power and Energy Magazine.
[13] R. A. Jabr,et al. Robust Transmission Network Expansion Planning With Uncertain Renewable Generation and Loads , 2013, IEEE Transactions on Power Systems.
[14] Mohammad Shahidehpour,et al. The IEEE Reliability Test System-1996. A report prepared by the Reliability Test System Task Force of the Application of Probability Methods Subcommittee , 1999 .
[15] Ruben Romero,et al. Transmission network expansion planning with security constraints , 2005 .
[16] Mohammad Shahidehpour,et al. Major Grid Blackouts: Analysis, Classification, and Prevention , 2013 .
[17] A. Conejo,et al. Offering Strategy Via Robust Optimization , 2011, IEEE Transactions on Power Systems.
[18] Jose M. Arroyo,et al. Application of a genetic algorithm to n-K power system security assessment , 2013 .
[19] S. Salon,et al. Optimization of Transmission Line Planning Including Security Constraints , 1989, IEEE Power Engineering Review.
[20] X. Wang,et al. Modern power system planning , 1994 .
[21] Philip G. Hill,et al. Power generation , 1927, Journal of the A.I.E.E..
[22] Ruiwei Jiang,et al. Robust Unit Commitment With Wind Power and Pumped Storage Hydro , 2012, IEEE Transactions on Power Systems.
[23] A. Santos,et al. Interactive Transmission Network Planning Using a Least-Effort Criterion , 1982, IEEE Transactions on Power Apparatus and Systems.
[24] Xu Andy Sun,et al. Adaptive Robust Optimization for the Security Constrained Unit Commitment Problem , 2013, IEEE Transactions on Power Systems.
[25] Stephen P. Boyd,et al. Convex Optimization , 2004, Algorithms and Theory of Computation Handbook.
[26] Haozhong Cheng,et al. The Interval Minimum Load Cutting Problem in the Process of Transmission Network Expansion Planning Considering Uncertainty in Demand , 2008, IEEE Transactions on Power Systems.
[27] Jose M. Arroyo,et al. Energy and Reserve Scheduling Under a Joint Generation and Transmission Security Criterion: An Adjustable Robust Optimization Approach , 2014, IEEE Transactions on Power Systems.
[28] J. Arroyo,et al. A Risk-Based Approach for Transmission Network Expansion Planning Under Deliberate Outages , 2010, IEEE Transactions on Power Systems.