Where have all the data gone? Stochastic production frontiers with multiply imputed German establishment data

"In this paper, stochastic production frontier models are estimated with IAB establishment data from waves 2002 and 2003 to find important determinants of productivity and ineffciency. The data suffer from nonresponse in the most important variables (output, capital and labor) leading to the loss of 25 % of the observations and possibly imprecise estimates and invalid test statistics. Therefore, the missing values are multiply imputed. Analyzes of the estimation results show that, particularly in the ineffciency submodel, working with multiply imputed data reveals some interesting and plausible results which are not available when ignoring missing observations." (Author's abstract, IAB-Doku) ((en))

[1]  Xiao-Li Meng,et al.  Multiple-Imputation Inferences with Uncongenial Sources of Input , 1994 .

[2]  Claus Schnabel,et al.  Works councils – sand or grease in the operation of German firms? , 2002 .

[3]  Annette Kohlmann,et al.  The Research Data Centre of the Federal Employment Service in the Institute for Employment Research , 2005, Journal of Contextual Economics – Schmollers Jahrbuch.

[4]  J. Schafer Multiple imputation: a primer , 1999, Statistical methods in medical research.

[5]  Edward P. Lazear,et al.  Agency, Earnings Profiles, Productivity, and Hours Restrictions , 1981 .

[6]  D. Rubin,et al.  Small-sample degrees of freedom with multiple imputation , 1999 .

[7]  Uwe Blien,et al.  Local Economic Structure and Industry Development in Germany, 1993-2001 , 2004 .

[8]  Stephan L. Thomsen,et al.  Individual employment effects of job creation schemes in Germany with respect to sectoral heterogeneity , 2005 .

[9]  D. Rubin INFERENCE AND MISSING DATA , 1975 .

[10]  R. Stevenson Likelihood functions for generalized stochastic frontier estimation , 1980 .

[11]  D. Rubin,et al.  Multiple Imputation for Nonresponse in Surveys , 1989 .

[12]  D. Rubin Multiple imputation for nonresponse in surveys , 1989 .

[13]  Uwe Jensen,et al.  Misspecification Preferred: The Sensitivity of Inefficiency Rankings , 2005 .

[14]  Michael Lechner,et al.  Long-Run Effects of Public Sector Sponsored Training in West Germany , 2004, SSRN Electronic Journal.

[15]  C. Schnabel Trade Unions and Productivity: The German Evidence , 1991 .

[16]  W. Greene Frontier Production Functions , 1993 .

[17]  D. Reifschneider,et al.  SYSTEMATIC DEPARTURES FROM THE FRONTIER: A FRAMEWORK FOR THE ANALYSIS OF FIRM INEFFICIENCY* , 1991 .

[18]  Stefan Bender,et al.  The linked employer-employee dataset of the IAB (LIAB) , 2005 .

[19]  Thorsten Schank,et al.  Are overtime plants more efficient than standard-time plants? A stochastic production frontier analysis using the IAB Establishment Panel , 2005 .

[20]  Gesine Stephan,et al.  Collective Contracts, Wages and Wage Dispersion in a Multi-Level Model , 2004 .

[21]  Joachim Wagner,et al.  German Works Councils in the Production Process , 2003 .

[22]  A. Gelman,et al.  Not Asked and Not Answered: Multiple Imputation for Multiple Surveys , 1998 .

[23]  D. Rubin,et al.  MULTIPLE IMPUTATIONS IN SAMPLE SURVEYS-A PHENOMENOLOGICAL BAYESIAN APPROACH TO NONRESPONSE , 2002 .

[24]  J. Schafer Multiple Imputation in Multivariate Problems When the Imputation and Analysis Models Differ , 2003 .

[25]  A. Bryman,et al.  Encyclopedia of Social Science Research Methods , 2004 .

[26]  P. Schmidt Frontier production functions , 1985 .

[27]  A. U.S.,et al.  FORMULATION AND ESTIMATION OF STOCHASTIC FRONTIER PRODUCTION FUNCTION MODELS , 2001 .

[28]  D. Rubin,et al.  Multiple Imputation for Interval Estimation from Simple Random Samples with Ignorable Nonresponse , 1986 .

[29]  Gesine Stephan,et al.  How collective contracts and works councils reduce the gender wage gap , 2004 .

[30]  D. Rubin,et al.  Statistical Analysis with Missing Data. , 1989 .

[31]  W. Meeusen,et al.  Efficiency Estimation from Cobb-Douglas Production Functions with Composed Error , 1977 .

[32]  Timothy Coelli,et al.  An Introduction to Efficiency and Productivity Analysis , 1997 .

[33]  Joseph L Schafer,et al.  Modeling and imputation of semicontinuous survey variables , 1999 .