Receding horizon load restoration for coupled transmission and distribution system considering load-source uncertainty
暂无分享,去创建一个
Qiuwei Wu | Jin Zhao | Yao Liu | Hongtao Wang | Qiuwei Wu | Hongtao Wang | Jin Zhao | Yao Liu
[1] Lei Sun,et al. A Model Predictive Control Based Generator Start-Up Optimization Strategy for Restoration With Microgrids as Black-Start Resources , 2018, IEEE Transactions on Power Systems.
[2] Wei Sun,et al. Incorporating Wind Energy in Power System Restoration Planning , 2019, IEEE Transactions on Smart Grid.
[3] Fushuan Wen,et al. A Restorative Self-Healing Algorithm for Transmission Systems Based on Complex Network Theory , 2016, IEEE Transactions on Smart Grid.
[4] Stanislav Uryasev,et al. Conditional Value-at-Risk for General Loss Distributions , 2002 .
[5] Jianzhong Tong,et al. Two-Stage Adaptive Restoration Decision Support System for a Self-Healing Power Grid , 2017, IEEE Transactions on Industrial Informatics.
[6] Jin Zhao,et al. Utility-Oriented Online Load Restoration Considering Wind Power Penetration , 2019, IEEE Transactions on Sustainable Energy.
[7] Jianhui Wang,et al. MPC-Based Appliance Scheduling for Residential Building Energy Management Controller , 2013, IEEE Transactions on Smart Grid.
[8] Dirk Van Hertem,et al. Receding Horizon Control of Wind Power to Provide Frequency Regulation , 2017, IEEE Transactions on Power Systems.
[9] Feng Qiu,et al. An Integrated Approach for Power System Restoration Planning , 2017, Proceedings of the IEEE.
[10] R. Rockafellar,et al. Optimization of conditional value-at risk , 2000 .
[11] Mahmud Fotuhi-Firuzabad,et al. Enhancing Power System Resilience Through Hierarchical Outage Management in Multi-Microgrids , 2016, IEEE Transactions on Smart Grid.
[12] Jie Zhang,et al. A data-driven multi-model methodology with deep feature selection for short-term wind forecasting , 2017 .
[13] Pascal Van Hentenryck,et al. A Linear-Programming Approximation of AC Power Flows , 2012, INFORMS J. Comput..
[14] T. Fujimoto,et al. Development of an Optical Current Transformer for Adjustable Speed Pumped Storage Systems , 1997, IEEE Power Engineering Review.
[15] Yi Ding,et al. A Convex Model of Risk-Based Unit Commitment for Day-Ahead Market Clearing Considering Wind Power Uncertainty , 2015, IEEE Transactions on Power Systems.
[16] Hen-Geul Yeh,et al. Adaptive VAR Control for Distribution Circuits With Photovoltaic Generators , 2012, IEEE Transactions on Power Systems.
[17] M. M. Adibi,et al. Frequency response of prime movers during restoration , 1999 .
[18] Stephen P. Boyd,et al. Receding Horizon Control , 2011, IEEE Control Systems.
[19] Wei Sun,et al. Coordinating generation and load pickup during load restoration with discrete load increments and reserve constraints , 2015 .
[20] Yong Fu,et al. System of Systems Based Security-Constrained Unit Commitment Incorporating Active Distribution Grids , 2014, IEEE Transactions on Power Systems.
[21] Wei Sun,et al. Optimal Generator Start-Up Strategy for Bulk Power System Restoration , 2011, IEEE Transactions on Power Systems.
[22] R. Jabr. Robust self-scheduling under price uncertainty using conditional value-at-risk , 2005, IEEE Transactions on Power Systems.
[23] Jianhui Wang,et al. MPC-Based Voltage/Var Optimization for Distribution Circuits With Distributed Generators and Exponential Load Models , 2014, IEEE Transactions on Smart Grid.
[24] A. Fabbri,et al. Assessment of the cost associated with wind generation prediction errors in a liberalized electricity market , 2005, IEEE Transactions on Power Systems.