Applying the AHP to support the best-value contractor selection-lessons learned from two case studies in Taiwan
暂无分享,去创建一个
Wei-Chih Wang | Ming-Tsung Lee | I-Tung Yang | Wen-der Yu | Yuan-Yuan Cheng | Chun-Chang Lin | Wei-Chih Wang | I. Yang | Wen-der Yu | Ming-Tsung Lee | Chun-Chang Lin | Yuan-Yuan Cheng
[1] Sidhartha S. Padhi,et al. Contractor selection in government procurement auctions: a case study , 2009 .
[2] Martin Skitmore,et al. Contractor selection using multi criteria utility theory: an additive mode , 1998 .
[3] Abdullah M. Alsugair. Framework for Evaluating Bids of Construction Contractors , 1999 .
[4] A. Akintoye,et al. Achieving best value in private finance initiative project procurement , 2003 .
[5] Tarek Zayed,et al. Best-Value Model Based on Project Specific Characteristics , 2008 .
[6] Ahmed H. Elyamany,et al. Contractor Performance Evaluation for the Best Value of Superpave Projects , 2010 .
[7] Kamal M. Al‐Subhi Al‐Harbi,et al. Application of the AHP in project management , 2001 .
[8] Konstantinos P. Anagnostopoulos,et al. An AHP model for construction contractor prequalification , 2006, Oper. Res..
[9] Sławomir Biruk,et al. Assessing contractor selection criteria weights with fuzzy AHP method application in group decision environment , 2010 .
[10] Yawei Li,et al. Fuzzy Approach to Prequalifying Construction Contractors , 2007 .
[11] Keith R. Molenaar,et al. Best-Value Procurement Methods for Highway Construction Projects , 2006 .
[12] Wei-Chih Wang,et al. Improving AHP for construction with an adaptive AHP approach (A3) , 2008 .
[13] Hemanta Doloi,et al. Application of AHP in improving construction productivity from a management perspective , 2008 .
[14] Jakrapong Pongpeng,et al. TenSeM: a multicriteria and multidecision-makers' model in tender evaluation , 2003 .
[15] Luis F. Alarcón,et al. PERFORMANCE MODELING FOR CONTRACTOR SELECTION , 2002 .
[16] Robert L. K. Tiong,et al. A Fuzzy Decision Framework for Contractor Selection , 2005 .
[17] Valentinas Podvezko,et al. Complex evaluation of contracts for construction , 2010 .
[18] David Eaton,et al. Contractor pre-qualification model: State-of-the-art , 2007 .
[19] T. L. Saaty. Exploring the interface between hierarchies, multiple objectives and fuzzy sets , 1978 .
[20] Jiaqin Yang,et al. AN AHP DECISION MODEL FOR FACILITY LOCATION SELECTION , 1997 .
[21] Fredrik Waara. Mitigating contractual hazards in public procurement: a study of Swedish local authorities , 2008 .
[22] Thomas L. Saaty,et al. Multicriteria Decision Making: The Analytic Hierarchy Process: Planning, Priority Setting, Resource Allocation , 1990 .
[23] Marcello Braglia,et al. Application of the AHP methodology in making a proposal for a public work contract , 2006 .
[24] Zohar J. Herbsman,et al. MULTIPARAMETER BIDDING SYSTEM - INNOVATION IN CONTRACT ADMINISTRATION , 1992 .
[25] Heng Li,et al. Contractor selection using the analytic network process , 2004 .
[26] Wei-Chih Wang,et al. Contractor selection by the most advantageous tendering approach in Taiwan , 2003 .
[27] Dinko Kancijan,et al. AHP as a decision support tool in the multicriteria evaluation of bids in public procurement , 2010, Proceedings of the ITI 2010, 32nd International Conference on Information Technology Interfaces.
[28] Taishi Ohno,et al. A Comparison of Tendering and Contracting Systems for Public Works between Japan , the United States and EU Countries 1 ) , 2005 .
[29] C. M. Tam,et al. Comparing non-structural fuzzy decision support system and analytical hierarchy process in decision-making for construction problems , 2006, Eur. J. Oper. Res..
[30] Michael A. Ellicott,et al. Best-value contracting criteria , 1997 .
[31] Patrick S. W. Fong,et al. Final contractor selection using the analytical hierarchy process , 2000 .
[32] Cheng-Ru Wu,et al. A Fuzzy ANP-based Approach to Evaluate Medical Organizational Performance , 2008 .
[33] J. Bröchner,et al. Price and Nonprice Criteria for Contractor Selection , 2006 .