Applying the AHP to support the best-value contractor selection-lessons learned from two case studies in Taiwan

Abstract Lately the Best-Value (BV) method for contractor selection has been receiving considerable attention in the public sector in many countries. However, the operations used in performing the BV method often differ due to the various government procurement requirements. Consequently, some of the methods popular in the academic community are not easily incorporated in the BV method in some countries. To enhance the procurement process, this study aims to gain experience by applying the well-known analytical hierarchy process (AHP) to weight the decision criteria for selecting BV contractors of two construction projects in Taiwan. Through these two case studies, this work confirms that the AHP provides a significant benefit for considering the individual preferences of all decision-makers when weighting the criteria. However, this study finds two major potential obstacles, the legal requirements associated with using the AHP and the time it takes to implement the AHP. To overcome these obstacles, this ...

[1]  Sidhartha S. Padhi,et al.  Contractor selection in government procurement auctions: a case study , 2009 .

[2]  Martin Skitmore,et al.  Contractor selection using multi criteria utility theory: an additive mode , 1998 .

[3]  Abdullah M. Alsugair Framework for Evaluating Bids of Construction Contractors , 1999 .

[4]  A. Akintoye,et al.  Achieving best value in private finance initiative project procurement , 2003 .

[5]  Tarek Zayed,et al.  Best-Value Model Based on Project Specific Characteristics , 2008 .

[6]  Ahmed H. Elyamany,et al.  Contractor Performance Evaluation for the Best Value of Superpave Projects , 2010 .

[7]  Kamal M. Al‐Subhi Al‐Harbi,et al.  Application of the AHP in project management , 2001 .

[8]  Konstantinos P. Anagnostopoulos,et al.  An AHP model for construction contractor prequalification , 2006, Oper. Res..

[9]  Sławomir Biruk,et al.  Assessing contractor selection criteria weights with fuzzy AHP method application in group decision environment , 2010 .

[10]  Yawei Li,et al.  Fuzzy Approach to Prequalifying Construction Contractors , 2007 .

[11]  Keith R. Molenaar,et al.  Best-Value Procurement Methods for Highway Construction Projects , 2006 .

[12]  Wei-Chih Wang,et al.  Improving AHP for construction with an adaptive AHP approach (A3) , 2008 .

[13]  Hemanta Doloi,et al.  Application of AHP in improving construction productivity from a management perspective , 2008 .

[14]  Jakrapong Pongpeng,et al.  TenSeM: a multicriteria and multidecision-makers' model in tender evaluation , 2003 .

[15]  Luis F. Alarcón,et al.  PERFORMANCE MODELING FOR CONTRACTOR SELECTION , 2002 .

[16]  Robert L. K. Tiong,et al.  A Fuzzy Decision Framework for Contractor Selection , 2005 .

[17]  Valentinas Podvezko,et al.  Complex evaluation of contracts for construction , 2010 .

[18]  David Eaton,et al.  Contractor pre-qualification model: State-of-the-art , 2007 .

[19]  T. L. Saaty Exploring the interface between hierarchies, multiple objectives and fuzzy sets , 1978 .

[20]  Jiaqin Yang,et al.  AN AHP DECISION MODEL FOR FACILITY LOCATION SELECTION , 1997 .

[21]  Fredrik Waara Mitigating contractual hazards in public procurement: a study of Swedish local authorities , 2008 .

[22]  Thomas L. Saaty,et al.  Multicriteria Decision Making: The Analytic Hierarchy Process: Planning, Priority Setting, Resource Allocation , 1990 .

[23]  Marcello Braglia,et al.  Application of the AHP methodology in making a proposal for a public work contract , 2006 .

[24]  Zohar J. Herbsman,et al.  MULTIPARAMETER BIDDING SYSTEM - INNOVATION IN CONTRACT ADMINISTRATION , 1992 .

[25]  Heng Li,et al.  Contractor selection using the analytic network process , 2004 .

[26]  Wei-Chih Wang,et al.  Contractor selection by the most advantageous tendering approach in Taiwan , 2003 .

[27]  Dinko Kancijan,et al.  AHP as a decision support tool in the multicriteria evaluation of bids in public procurement , 2010, Proceedings of the ITI 2010, 32nd International Conference on Information Technology Interfaces.

[28]  Taishi Ohno,et al.  A Comparison of Tendering and Contracting Systems for Public Works between Japan , the United States and EU Countries 1 ) , 2005 .

[29]  C. M. Tam,et al.  Comparing non-structural fuzzy decision support system and analytical hierarchy process in decision-making for construction problems , 2006, Eur. J. Oper. Res..

[30]  Michael A. Ellicott,et al.  Best-value contracting criteria , 1997 .

[31]  Patrick S. W. Fong,et al.  Final contractor selection using the analytical hierarchy process , 2000 .

[32]  Cheng-Ru Wu,et al.  A Fuzzy ANP-based Approach to Evaluate Medical Organizational Performance , 2008 .

[33]  J. Bröchner,et al.  Price and Nonprice Criteria for Contractor Selection , 2006 .