Dynamics of Project-Driven Production Systems in Construction: Productivity Function
暂无分享,去创建一个
Kenneth K. Walsh | Vicente González | Omar Rojas | Ricardo Antunes | Omar G. Rojas | V. González | R. Antunes | Kenneth Walsh
[1] Germán Riaño,et al. A new look at transient versions of Little's law, and M/G/1 preemptive last-come-first-served queues , 2010, Journal of Applied Probability.
[2] Yoram Koren,et al. Operation of Manufacturing Systems with Work-in-process Inventory and Production Control , 2004 .
[3] Anil Sawhney,et al. Production System Loading-Cycle Time Relationship in Residential Construction , 2005 .
[4] Klaus H. Ostenfeld,et al. Major bridge projects—a multi-disciplinary approach , 2011 .
[5] David Shan-Hill Wong,et al. Controller design and reduction of bullwhip for a model supply chain system using z-transform analysis , 2004 .
[6] Leonhard E. Bernold. Simulation of Nonsteady Construction Processes , 1989 .
[7] Avi Herbon,et al. Transient Little’s Law for the First and Second Moments of G/M/1/N Queue Measures , 2010 .
[8] Hugues Garnier,et al. Continuous-time model identification from sampled data: Implementation issues and performance evaluation , 2003 .
[9] E. C. Martínez,et al. On performance modeling of project-oriented production , 1997 .
[10] Howard H. Bashford,et al. Production Equations for Unsteady-State Construction Processes , 2007 .
[11] Denis Royston Towill,et al. Assessing manufacturing system performance: Frequency response revisited , 1990 .
[12] Iris D. Tommelein,et al. PARADE GAME :I MPACT OF WORK FLOW VARIABILITY ON TRADE PERFORMANCE , 1999 .
[13] V. N. Schrodt. UNSTEADY-STATE PROCESSING , 1967 .
[14] Salman Taghizadegan,et al. Essentials Of Lean Six Sigma , 2006 .
[15] Eric Chicken,et al. Nonparametric Statistical Methods: Hollander/Nonparametric Statistical Methods , 1973 .
[16] Douglas A. Wolfe,et al. Nonparametric Statistical Methods , 1973 .
[17] Wilson J. Rugh,et al. Linear system theory (2nd ed.) , 1996 .
[18] Wolter J. Fabrycky,et al. Systems engineering and analysis , 1981 .
[19] Luis F. Alarcón,et al. Improving Planning Reliability and Project Performance using the Reliable Commitment Model. , 2010 .
[20] A. Antoulas. Mathematical System Theory , 1991 .
[21] Haralambos Sarimveis,et al. An adaptive model predictive control configuration for production-inventory systems , 2008 .
[22] Norman S. Nise,et al. Control Systems Engineering , 1991 .
[23] Denis Royston Towill,et al. Dynamic analysis of an inventory and order based production control system , 1982 .
[24] Yoshifumi Okuyama. Discrete Control Systems , 2013 .
[25] Young-Jun Son,et al. Effect of information update frequency on the stability of production–inventory control systems , 2007 .
[26] W. Duncan. A GUIDE TO THE PROJECT MANAGEMENT BODY OF KNOWLEDGE , 1996 .
[27] Edward R. Marsh. The Harmonogram of Karol Adamiecki , 1975 .
[28] E. H. Neilsen,et al. The subordinate's predicaments. , 1979, Harvard business review.
[29] Rajiv D. Banker,et al. Productivity Measurement and Management Accounting , 1989 .
[30] Mani Poshdar,et al. Characterization of Process Variability in Construction , 2014 .
[31] Ricardo Antunes,et al. Quicker reaction, lower variability: The effect of transient time in flow variability of project-driven production , 2016, ArXiv.
[32] J. Maxwell. I. On governors , 1868, Proceedings of the Royal Society of London.
[33] Rob J Hyndman,et al. Another look at measures of forecast accuracy , 2006 .
[34] Mario C. Cirillo,et al. On the use of the normalized mean square error in evaluating dispersion model performance , 1993 .
[35] Vicente González,et al. A Production Model for Construction: A Theoretical Framework , 2015 .
[36] Dimitris Bertsimas,et al. Transient laws of non-stationary queueing systems and their applications , 1997, Queueing Syst. Theory Appl..
[37] Russell L. Purvis,et al. Project Management under Uncertainty: The Impact of Heuristics and Biases , 2002 .
[38] Luis F. Alarcón,et al. Bullwhip effect, in production control: a comparison between traditional methods and LPS , 2013 .
[39] Marvin D. Troutt,et al. Dynamic simulation of the supply chain for a short life cycle product - Lessons from the Tamagotchi case , 2004, Comput. Oper. Res..
[40] Magdalena Hajdasz,et al. Managing repetitive construction in a dynamically changing project environment: Conceptualizing the system–model–simulator nexus , 2015 .
[41] M. Lambrecht,et al. Transfer function analysis of forecasting induced bullwhip in supply chains , 2002 .
[42] Lyndall F. Urwick. The Golden book of management : a historical record of the life and work of seventy pioneers , 1956 .
[43] Wolfgang Altmann,et al. Practical Process Control for Engineers and Technicians , 2005 .
[44] Vicente González,et al. Carpenters setting the formwork for slab data, Chile 2008 , 2017 .
[45] David G. Carmichael. The conceptual power of control systems theory in engineering practice , 2013 .
[46] Ahmed Mahmoud Dief. Dynamic analysis of agile manufacturing planning and control (MPC) systems using control theory , 2007 .
[47] Wallace Clark,et al. The Gantt chart : a working tool of management , 2022 .
[48] R. Adelson,et al. The Dynamic Behaviour of Linear Forecasting and Scheduling Rules , 1966 .
[49] Tong Zhao,et al. Improved Baseline Method to Calculate Lost Construction Productivity , 2014 .
[50] E. R. Marsh. Research Notes. THE HARMONOGRAM OF KAROL ADAMIECKI. , 1975 .
[51] Martin Bohner,et al. Laplace transform and Z-transform: unification and extension , 2002 .
[52] Refaat H. Abdel-Razek,et al. Labor productivity: Benchmarking and variability in Egyptian projects , 2007 .
[53] Fred L. Collopy,et al. Error Measures for Generalizing About Forecasting Methods: Empirical Comparisons , 1992 .
[54] M. Ortega,et al. Control theory applications to the production–inventory problem: a review , 2004 .
[55] David C. Lane,et al. Invited Review and Reappraisal Industrial Dynamics. , 1997 .
[56] Simaan M. AbouRizk,et al. Applying Basic Control Theory Principles to Project Control: Case Study of Off-Site Construction Shops , 2012, J. Comput. Civ. Eng..