Truck and Shovel Versus In-Pit Conveyor Systems: a Comparison Of The Valuable Operating Time
暂无分享,去创建一个
Mehmet S. Kizil | Saiied M. Aminossadati | Peter Knights | Micah Nehring | Isaac Dzakpata | P. Knights | M. Kizil | Isaac Dzakpata | S. Aminossadati | M. Nehring
[1] Mehmet S. Kizil,et al. Improving truck-shovel matching , 2011 .
[2] J. C. Emery. Improving coal mining production performance through the application of Total Production Management , 1998 .
[3] Enayagollah Bozorgebrahimi. The evaluation of haulage truck size effects on open pit mining , 2004 .
[4] Behzad Ghodrati,et al. Mine Production Index (MPI): New Method to Evaluate Effectiveness of Mining Machinery , 2014 .
[5] Don T. Phillips,et al. Operational efficiency and effectiveness measurement , 2001 .
[6] Caccetta,et al. Models for Mining Equipment Selection , 2005 .
[7] Peter Muchiri,et al. Performance measurement using overall equipment effectiveness (OEE): literature review and practical application discussion , 2008 .
[8] Pandurangappa C,et al. International Journal of Emerging Technology and Advanced Engineering , 2022 .
[9] Lou Caccetta,et al. Equipment Selection for Surface Mining: A Review , 2014, Interfaces.
[10] S. Fiscor. Productivity considerations for shovels and excavators , 2007 .
[11] Jacek K. Radlowski. In-pit crushing and conveying as an alternative to an all truck system in open pit mines , 1988 .