A fuzzy approach to operation selection

Abstract Production management and scheduling problems inflexible manufacturing systems (FMSs) are complicated, compared with those problems in job shops and transfer lines. Due to the flexibility of FMSs, alternative operations are common. This paper presents a fuzzy approach to operation and routing selection via simulation. The rule developed here is compared with some other well-known conventional rules like WINQ (work in queue) and SNQ (shortest number of jobs in queue).

[1]  Shimon Y. Nof,et al.  A flow control modeling approach for computerized manufacturing systems , 1985 .

[2]  L. N. Van Wassenhove,et al.  Analysis of Scheduling Rules for an FMS , 1990 .

[3]  C. S. Orloff A fundamental problem in vehicle routing , 1974, Networks.

[4]  Oded Maimon,et al.  Dynamic Scheduling and Routing for Flexible Manufacturing Systems that Have Unreliable Machines , 1988, Oper. Res..

[5]  N. Singh,et al.  A fuzzy approach to multi-objective routing problem with applications to process planning in manufacturing systems , 1991 .

[6]  Yash P. Aneja,et al.  Multiobjective modelling and analysis of process planning in a manufacturing system , 1990 .

[7]  Eric M. Malstrom,et al.  Evaluation of traditional work scheduling rules in a flexible manufacturing system with a physical simulator , 1988 .

[8]  Robert M. O'Keefe,et al.  Interaction between dispatching and next station selection rules in a dedicated flexible manufacturing system , 1992 .

[9]  W. E. Wilhelm,et al.  Effectiveness of alternate operations in a flexible manufacturing system , 1985 .

[10]  J. Buzacott "Optimal" operating rules for automated manufacturing systems , 1980 .

[11]  Moshe Sniedovich,et al.  A MULTI-OBJECTIVE ROUTING PROBLEM REVISITED , 1988 .

[12]  J. A. Buzacott,et al.  Models for Understanding Flexible Manufacturing Systems , 1980 .

[13]  Alessandro Agnetis,et al.  Part routing in flexible assembly systems , 1990, IEEE Trans. Robotics Autom..

[14]  Richard Bellman,et al.  Decision-making in fuzzy environment , 2012 .

[15]  Shimon Y. Nof,et al.  A game-theoretic approach for co-operation control in multi-machine workstations , 1990 .

[16]  George Chryssolouris,et al.  An approach to real-time flexible scheduling , 1994 .

[17]  Joong-In Kim,et al.  Multi-criteria operational control rules in flexible manufacturing systems (FMSs) , 1990 .

[18]  Basheer M. Khumawala,et al.  Scheduling random flexible manufacturing systems with dynamic environments , 1990 .

[19]  Felix T.S. Chan,et al.  Simulation Aids JIT Assembly Line Manufacture: A Case Study , 1993 .

[20]  N. Sancho A MULTI-OBJECTIVE ROUTING PROBLEM , 1986 .

[21]  Felix T.S. Chan,et al.  Using simulation to predict system performance: a case study of an electro‐phoretic deposition plant , 1995 .