Periodic production scheduling at a fastener manufacturer

Abstract This paper presents the application of periodic production scheduling at a metal-fastener manufacturing company. The problem was initially presented as a mandate to reduce finished goods inventory by 33%. Preliminary investigations, however, revealed that any effort to reduce finished goods inventory necessarily involved two major endeavors: 1. (1) significant improvements to forecasting and 2. (2) a periodic production scheduling system (PPS). The forecasting system provided the input to the PPS system. The PPS required initial procedures for sorting parts into families, which, as far as possible, shared the same setup patterns, engineering specifications, raw material requirements, etc. The PPS itself was developed on a spreadsheet, and the output from this package fed into an interactive PC package. In addition to graphic presentation of production scheduling, the PC software package also provided manpower implications of specific PPS plans for tooling and supervision during runs, on the basis of the periodic schedule. The paper concludes with lessons learned from attempts to finalize implementation.

[1]  A. Federgruen,et al.  Coordinated Replenishments in a Multi-Item Inventory System with Compound Poisson Demands , 1984 .

[2]  Steven C. Wheelwright,et al.  Forecasting methods and applications. , 1979 .

[3]  C. Yano,et al.  The strategic use of capacity slack in the economic lot scheduling problem with random demand , 1994 .

[4]  Uday S. Karmarkar,et al.  Lot Sizes, Lead Times and In-Process Inventories , 1987 .

[5]  S. Elmaghraby The Economic Lot Scheduling Problem (ELSP): Review and Extensions , 1978 .

[6]  Uday S. Karmarkar,et al.  Lot-Sizing and Lead-time Performance in a Manufacturing Cell , 1985 .

[7]  G. Gallego Scheduling the production of several items with random demands in a single facility , 1990 .

[8]  Christopher S. Tang Scheduling batches on parallel machines with major and minor set-ups , 1990 .

[9]  Graham K. Rand,et al.  Decision Systems for Inventory Management and Production Planning , 1979 .

[10]  Paul H. Zipkin Computing Optimal Lot Sizes in the Economic Lot Scheduling Problem , 1991, Oper. Res..

[11]  Gregory Dobson,et al.  The Economic Lot-Scheduling Problem: Achieving Feasibility Using Time-Varying Lot Sizes , 1987, Oper. Res..

[12]  Gregory Dobson The Cyclic Lot Scheduling Problem with Sequence-Dependent Setups , 1992, Oper. Res..

[13]  Derek A. Atkins,et al.  Periodic Versus Can-Order Policies for Coordinated Multi-Item Inventory Systems , 1988 .

[14]  Robin O. Roundy,et al.  Rounding Off to Powers of Two in Continuous Relaxations of Capacitated Lot Sizing Problems , 1989 .

[15]  A. Federgruen,et al.  The stochastic Economic Lot Scheduling Problem: cyclical base-stock policies with idle times , 1996 .