Process simulation training- as it has been, is, and should be
暂无分享,去创建一个
Figure 1 Autodynamics, Inc. Model 1501 Process Simulator-Trainer with steam-boiler program ments of their processes on a specific rather than a generalized basis. Furthermore, process training should be done on a fast time scale, to be costeffective (since real plant-time constants are 10 hours or longer) yet not exceed the instrument-monitoring capabilities or response-time limitations of the human operator. Cost of the device and ease of changing the simulator from one process to another must also be considered.