A Parametric Multi-start Algorithm for Solving the Response Time Variability Problem
暂无分享,去创建一个
Albert Corominas | Alberto García-Villoria | Rafael Pastor | A. Corominas | R. Pastor | A. García-Villoria | Alberto García-Villoria
[1] Carl A. Waldspurger,et al. Lottery and stride scheduling: flexible proportional-share resource management , 1995 .
[2] Marc Los,et al. Combinatorial Programming, Statistical Optimization and the Optimal Transportation Network Problem , 1980 .
[3] Thomas Stützle,et al. Stochastic Local Search: Foundations & Applications , 2004 .
[4] Rafael Martí. Multi-Start Methods , 2003, Handbook of Metaheuristics.
[5] Celia A. Glass,et al. The Scheduling of Maintenance Service , 1998, Discret. Appl. Math..
[6] Albert Corominas,et al. Solving the Response Time Variability Problem by means of metaheuristics , 2006, CCIA.
[7] Rami G. Melhem,et al. Time slot allocation for real-time messages with negotiable distance constraints , 1998, Proceedings. Fourth IEEE Real-Time Technology and Applications Symposium (Cat. No.98TB100245).
[8] Wieslaw Kubiak,et al. Response time variability , 2007, J. Sched..
[9] Alexander H. G. Rinnooy Kan,et al. A stochastic method for global optimization , 1982, Math. Program..
[10] Jeffrey W. Herrmann,et al. Generating Cyclic Fair Sequences using Aggregation and Stride Scheduling , 2007 .
[11] J. Miltenberg,et al. Level schedules for mixed-model assembly lines in just-in-time production systems , 1989 .
[12] Albert Corominas,et al. Solving the Response Time Variability Problem by means of Multi-start and GRASP metaheuristics , 2008, CCIA.
[13] M. Dorigo,et al. Algodesk : an experimental comparison of eight evolutionary heuristics applied to the Quadratic Assignment Problem , 1995 .