Hybrid Fuzzy-Bayesian Dynamic Decision Support Tool for Resource-Based Scheduling of Construction Projects

This dissertation proposes a flexible and intelligent decision support tool for scheduling and resource allocation of construction projects. A hybrid Fuzzy-Bayesian scheduling network and a new optimization model and solution approach have been developed to assess the combinatory effect of different risk factors on scheduling and optimize the time-cost tradeoff. Developed decision support tool employs interval-valued fuzzy numbers and Bayesian networks to dynamically quantify uncertainty and predict project performance during its makespan. Using interval-valued fuzzy numbers makes the model more flexible and intelligent comparing to conventional fuzzy risk assessment models through incorporating the decision makers` confidence degree. The linguistic assessments of experts regarding the likelihood and severity of increase or decrease in task duration and cost when influenced by different risk factors are used to generate a set of duration and cost prior-probability distributions.

[1]  Sami M. Baroum,et al.  The development of cash flow weight procedures for maximizing the net present value of a project , 1996 .

[2]  Chao Wang,et al.  Bayesian-Based Hybrid Simulation Approach to Project Completion Forecasting for Underground Construction , 2014 .

[3]  Nashwan Dawood Estimating project and activity duration: a risk management approach using network analysis , 1998 .

[4]  Lihong Zhou,et al.  Supporting decision making in risk management through an evidence-based information systems project risk checklist , 2008, Inf. Manag. Comput. Secur..

[5]  Sy-Ming Guu Fuzzy weighted averages revisited , 2002, Fuzzy Sets Syst..

[6]  Robert LIN,et al.  NOTE ON FUZZY SETS , 2014 .

[7]  E. Lee,et al.  Fuzzy weighted average: A max-min paired elimination method , 1996 .

[8]  Joseph J. Moder Network Techniques in Project Management , 2008 .

[9]  Salah E. Elmaghraby Mathematical Programming and Financial Objectives for Scheduling Projects , 2005, J. Sched..

[10]  Grzegorz Waligóra,et al.  Discrete-continuous project scheduling with discounted cash flows - A tabu search approach , 2008, Comput. Oper. Res..

[11]  Eric W. T. Ngai,et al.  Fuzzy decision support system for risk analysis in e-commerce development , 2005, Decis. Support Syst..

[12]  Anita Cerić,et al.  A risk-assessment methodology in tunneling , 2011 .

[13]  Won-Suk Jang,et al.  Project risk assessment model combining the fuzzy weighted average principle with a similarity measure , 2014 .

[14]  J. Perry,et al.  RISK AND ITS MANAGEMENT IN CONSTRUCTION PROJECTS. , 1985 .

[15]  H. Randolph Thomas,et al.  Factors Affecting Masonry‐Labor Productivity , 1991 .

[16]  A. Thorpe,et al.  Contractor project risks contingency allocation using linguistic approximation , 1993 .

[17]  Dwight E. Smith-Daniels,et al.  USING A LATE-START RESOURCE-CONSTRAINED PROJECT SCHEDULE TO IMPROVE PROJECT NET PRESENT VALUE* , 1987 .

[18]  Brenda McCabe,et al.  Evaluating Risk in Construction–Schedule Model (ERIC–S): Construction Schedule Risk Model , 2003 .

[19]  G. Wu,et al.  Risk Assessment for Construction Joint Ventures in China , 2001 .

[20]  S. Selcuk Erenguc,et al.  A Branch and Bound Procedure for the Resource Constrained Project Scheduling Problem with Discounted Cash Flows , 1996 .

[21]  Prasanta Kumar Dey Decision support system for risk management: a case study , 2001 .

[22]  L Sunde,et al.  Net-present-value cost/time tradeoff , 1995 .

[23]  Gündüz Ulusoy,et al.  A note on an iterative forward/backward scheduling technique with reference to a procedure by Li and Willis , 1996 .

[24]  John A. Kuprenas,et al.  Bridge Falsework Productivity—Measurement and Influences , 2003 .

[25]  Shahram Shadrokh,et al.  An Algorithm for the Weighted Earliness-Tardiness Unconstrained Project Scheduling Problem , 2008 .

[26]  Anna Klemetti,et al.  Risk Management in Construction Project Networks , 2006 .

[27]  Erik Demeulemeester,et al.  Scheduling projects with linear time-dependent cash flows to maximize the net present value , 1999 .

[28]  Nigel J. Smith,et al.  Application of a fuzzy based decision making methodology to construction project risk assessment , 2007 .

[29]  Matthew J. Liberatore,et al.  Project Planning under Uncertainty Using Scenario Analysis , 2005 .

[30]  Makarand Hastak,et al.  ICRAM-1: Model for International Construction Risk Assessment , 2000 .

[31]  Ying-Ming Wang,et al.  A fuzzy group decision making approach for bridge risk assessment , 2007, Comput. Ind. Eng..

[32]  Denis F. Cioffi,et al.  A practical method of determining project risk contingency budgets , 2009, J. Oper. Res. Soc..

[33]  Martin Neil,et al.  Inference in hybrid Bayesian networks using dynamic discretization , 2007, Stat. Comput..

[34]  Jürgen Zimmermann,et al.  A steepest ascent approach to maximizing the net present value of projects , 2001, Math. Methods Oper. Res..

[35]  Hyo-Nam Cho,et al.  Risk Assessment Methodology for Underground Construction Projects , 2004 .

[36]  Francis K. Adams Expert elicitation and Bayesian analysis of construction contract risks: an investigation , 2006 .

[37]  Joseph H. M. Tah,et al.  Knowledge-Based Approach to Construction Project Risk Management , 2001 .

[38]  Michael R. Duffey,et al.  Statistical dependence in risk analysis for project networks using Monte Carlo methods , 1999 .

[39]  Abdulmaten Taroun,et al.  Towards a better modelling and assessment of construction risk: Insights from a literature review , 2014 .

[40]  M. A. Mustafa,et al.  Project risk assessment using the analytic hierarchy process , 1991 .

[41]  Nii O Attoh-Okine,et al.  Probabilistic analysis of factors affecting highway construction costs: a belief network approach , 2002 .

[42]  Rema Padman,et al.  An integrated survey of deterministic project scheduling , 2001 .

[43]  Ossama A. Abdou,et al.  Managing Construction Risks , 1996 .

[44]  Joseph H. M. Tah,et al.  Risk interdependencies and natural language computations , 1996 .

[45]  J. D. Jones,et al.  Calculating functions of fuzzy numbers , 1993 .

[46]  Norman E. Fenton,et al.  Predicting Project Velocity in XP Using a Learning Dynamic Bayesian Network Model , 2009, IEEE Transactions on Software Engineering.

[47]  A. H. Russell Cash Flows in Networks , 1970 .

[48]  W. Duncan A GUIDE TO THE PROJECT MANAGEMENT BODY OF KNOWLEDGE , 1996 .

[49]  Norman Fenton,et al.  Risk Assessment and Decision Analysis with Bayesian Networks , 2012 .

[50]  Andrew D.F. Price,et al.  Modelling global risk factors affecting construction cost performance , 2003 .

[51]  Shyi-Ming Chen,et al.  Fuzzy risk analysis based on similarity measures between interval-valued fuzzy numbers and interval-valued fuzzy number arithmetic operators , 2009, Expert Syst. Appl..

[52]  Shyi-Ming Chen,et al.  Fuzzy risk analysis based on ranking fuzzy numbers using alpha-cuts, belief features and signal/noise ratios , 2009, Expert Syst. Appl..

[53]  Roman Słowiński,et al.  Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems , 1990 .

[54]  Erik Demeulemeester,et al.  On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints , 2001, Manag. Sci..

[55]  Jamal F. Al‐Bahar,et al.  Systematic Risk Management Approach for Construction Projects , 1990 .

[56]  Erik Demeulemeester,et al.  Progress payments in project scheduling problems , 2003, Eur. J. Oper. Res..

[57]  Martin Barnes How to allocate risks in construction contracts , 1983 .

[58]  Derek Beeston Combining risks in estimating , 1986 .

[59]  Willy Herroelen,et al.  Computational experience with an optimal procedure for the scheduling of activities to maximize the net present value of projects , 1993 .

[60]  J. H. Patterson,et al.  An Algorithm for a general class of precedence and resource constrained scheduling problems , 1989 .

[61]  Jian-Bo Yang,et al.  Review of Uncertainty Reasoning Approaches as Guidance for Maritime and Offshore Safety-Based Assessment , 2002 .

[62]  Sung-Lin Hsueh,et al.  On-line multi-criterion risk assessment model for construction joint ventures in China , 2007 .

[63]  Mao-Jiun J. Wang,et al.  Fuzzy weighted average: an improved algorithm , 1992 .

[64]  Rema Padman,et al.  A metaheuristic scheduling procedure for resource‐constrained projects with cash flows , 1999 .

[65]  Rema Padman,et al.  A Cooperative Multi-Agent Approach to Constrained Project Scheduling , 1997 .

[66]  Laura Uusitalo,et al.  Advantages and challenges of Bayesian networks in environmental modelling , 2007 .

[67]  Patrick X.W. Zou,et al.  Understanding the key risks in construction projects in China , 2007 .

[68]  Sadi Assaf,et al.  Causes of delay in large construction projects , 2006 .

[69]  Shyi-Ming Chen,et al.  Fuzzy risk analysis based on measures of similarity between interval-valued fuzzy numbers , 2008, Comput. Math. Appl..

[70]  Shyi-Ming Chen,et al.  A new method for analyzing fuzzy risk based on a new fuzzy ranking method between generalized fuzzy numbers , 2009, 2009 International Conference on Machine Learning and Cybernetics.

[71]  Jeffrey L. Riggs,et al.  Integration of technical, cost, and schedule risks in project management , 1994, Comput. Oper. Res..

[72]  Richard C. Grinold,et al.  The payment scheduling problem , 1972 .

[73]  Kenneth F. Reinschmidt,et al.  Probabilistic Forecasting of Project Duration Using Bayesian Inference and the Beta Distribution , 2009 .

[74]  Salah E. Elmaghraby,et al.  The scheduling of activities to maximize the net present value of projects , 1990 .

[75]  Dug Hun Hong,et al.  Some algebraic properties and a distance measure for interval-valued fuzzy numbers , 2002, Inf. Sci..

[76]  S. M. Baas,et al.  Rating and ranking of multiple-aspect alternatives using fuzzy sets , 1976, at - Automatisierungstechnik.

[77]  T. Saaty,et al.  The Analytic Hierarchy Process , 1985 .

[78]  Canan Sepil Comment on elmaghraby and herroelen's “The scheduling of activities to maximize the net present value of projects” , 1994 .

[79]  B. Mulholland,et al.  Risk Assessment in Construction Schedules , 1999 .

[80]  Shyi-Ming Chen,et al.  Fuzzy risk analysis based on fuzzy numbers with different shapes and different deviations , 2008, Expert Syst. Appl..

[81]  Tarek Zayed,et al.  Assessing risk and uncertainty inherent in Chinese highway projects using AHP , 2008 .

[82]  Daniel Kuhn,et al.  Maximizing the net present value of a project under uncertainty , 2010, Eur. J. Oper. Res..

[83]  Erik Demeulemeester,et al.  A branch-and-bound procedure for the multiple resource-constrained project scheduling problem , 1992 .

[84]  Kum Khiong Yang,et al.  Scheduling a project to maximize its net present value: An integer programming approach , 1993 .

[85]  Simaan M. AbouRizk,et al.  BELIEF NETWORKS FOR CONSTRUCTION PERFORMANCE DIAGNOSTICS , 1998 .

[86]  Liyin Shen,et al.  Project risk management in Hong Kong , 1997 .

[87]  K. MacCrimmon,et al.  An Analytical Study of the PERT Assumptions , 1964 .

[88]  Stephen O. Ogunlana,et al.  Planning for project control through risk analysis: a petroleum pipeline-laying project , 1994 .

[89]  Erik Demeulemeester,et al.  Project network models with discounted cash flows a guided tour through recent developments , 1997, Eur. J. Oper. Res..

[90]  Sami M. Baroum,et al.  An Exact Solution Procedure for Maximizing the Net Present Value of Cash Flows in a Network , 1999 .

[91]  A. Shtub,et al.  Scheduling projects to maximize net present value — the case of time-dependent, contingent cash flows , 1997 .

[92]  K. Kirsch Fuzzy Logic For Business Finance And Management , 2016 .

[93]  Irem Dikmen,et al.  Using fuzzy risk assessment to rate cost overrun risk in international construction projects , 2007 .

[94]  Osama Moselhi Pricing Construction Risk: Fuzzy Set Application , 1995 .

[95]  Kuo-Ping Lin,et al.  A Comparison of Discrete Algorithms for Fuzzy Weighted Average , 2006, IEEE Transactions on Fuzzy Systems.

[96]  Pejman Rezakhani,et al.  Classifying Key Risk Factors in Construction Projects , 2012 .

[97]  Df Cooper,et al.  Risk analysis of a construction cost estimate , 1985 .

[98]  V. Smith-Daniels,et al.  Maximizing the net present value of a project subject to materials and capital constraints , 1987 .

[99]  H. Sapolsky The Polaris System Development: Bureaucratic and Programmatic Success in Government , 1972 .

[100]  J. Patterson,et al.  Scheduling a Project to Maximize Its Present Value: A Zero-One Programming Approach , 1977 .

[101]  R. Etgar,et al.  Scheduling project activities to maximize the net present value the case of linear time-dependent cash flows , 1999 .

[102]  Joseph G. Szmerekovsky,et al.  Scheduling projects with stochastic activity duration to maximize expected net present value , 2009, Eur. J. Oper. Res..

[103]  Ana Nieto-Morote,et al.  A fuzzy approach to construction project risk assessment , 2011 .

[104]  Stephen O. Ogunlana,et al.  Quantifying schedule risk in construction projects using Bayesian belief networks , 2009 .

[105]  Abdollah Abdi,et al.  Project cost risk analysis: A Bayesian networks approach for modeling dependencies between cost items , 2014 .

[106]  Keith R. Molenaar,et al.  Programmatic Cost Risk Analysis for Highway Megaprojects , 2005 .

[107]  A. Shtub,et al.  A branch and bound algorithm for scheduling projects to maximize net present value: The case of time dependent, contingent cash flows , 1997 .

[108]  He Zhi Risk management for overseas construction projects , 2003 .

[109]  Martin Neil,et al.  Project Scheduling: Improved Approach to Incorporate Uncertainty Using Bayesian Networks , 2007 .

[110]  H. Randolph Thomas,et al.  Forecasting Labor Productivity Using Factor Model , 1994 .

[111]  Shyi-Ming Chen,et al.  Fuzzy risk analysis based on similarity measures of generalized fuzzy numbers , 2003, IEEE Trans. Fuzzy Syst..

[112]  Robert J. Chapman,et al.  The controlling influences on effective risk identification and assessment for construction design management , 2001 .

[113]  Rema Padman,et al.  Heuristic scheduling of resource‐constrained projects with cash flows , 1997 .

[114]  Luís Valadares Tavares,et al.  On the optimal management of project risk , 1998, Eur. J. Oper. Res..

[115]  Joseph H. M. Tah,et al.  A proposal for construction project risk assessment using fuzzy logic , 2000 .

[116]  Dong Hoon Lee,et al.  An efficient algorithm for fuzzy weighted average , 1997, Fuzzy Sets Syst..

[117]  Xu Cheng-yua Construction project risk assessment research based on FUZZY-AHP , 2009 .

[118]  Roozbeh Kangari,et al.  Construction risk assessment by linguistics , 1989 .