The validity of using activity type to structure tour-based scheduling models

A unique set of activity scheduling data is utilized in this paper to provide much needed empirical analysis of the sequence in which activities are planned in everyday life. This is used to assess the validity of the assumption that activities are planned in accordance to a fixed hierarchy of activity types: mandatory activities first (work/school), followed by joint maintenance, joint discretionary, allocated maintenance, and individual discretionary activities. Such an assumption is typical of current generation activity and tour-based travel demand models. However, the empirical results clearly do not support such assumptions. For instance, fewer than 50% of mandatory activities were actually planned first in related out-of-home tours; remaining activity types also did not take any particular precedence in the planning sequence. Given this, a search was made for the more salient attributes of activities (beyond activity type) that would better predict how they are planned within tours. Several ordered response choice models for different tour sizes were developed for this purpose, predicting the choice order of the 1st, 2nd, 3rd, etc. planned activity in the tour as a function of activity type, activity characteristics (duration, frequency, travel time, and involved persons), and individual characteristics. Activity duration played the most significant role in the models compared to any other single variable, wherein longer duration activities tended to be planned much earlier in tours. This strongly suggests that the amount of time-use, rather than the nature of the event as indicated by activity type, is a primary driver of within-tour planning order and offers potential for a much improved and valid fit.

[1]  S T Doherty INTERACTIVE METHODS FOR ACTIVITY SCHEDULING PROCESSES. IN: TRANSPORTATION SYSTEMS PLANNING. METHODS AND APPLICATIONS , 2003 .

[2]  Dick Ettema,et al.  A SIMULATION MODEL OF ACTIVITY SCHEDULING BEHAVIOUR , 1992 .

[3]  Sean T. Doherty,et al.  How Far in Advance Are Activities Planned? , 2005 .

[4]  R. McKelvey,et al.  A statistical model for the analysis of ordinal level dependent variables , 1975 .

[5]  Sean T. Doherty,et al.  Mixed Logit Model of Activity-Scheduling Time Horizon Incorporating Spatial–Temporal Flexibility Variables , 2005 .

[6]  Hjp Harry Timmermans,et al.  A learning-based transportation oriented simulation system , 2004 .

[7]  Harry Timmermans,et al.  Progress in Activity-Based Analysis , 2005 .

[8]  Mark Bradley,et al.  Activity-Based Travel Forecasting Models in the United States: Progress since 1995 and Prospects for the Future , 2005 .

[9]  M. Ben-Akiva,et al.  DEMONSTRATION OF AN ACTIVITY-BASED MODEL FOR PORTLAND , 1999 .

[10]  Tommy Gärling,et al.  Computer Simulation of Household Activity Scheduling , 1998 .

[11]  C. Bhat,et al.  Frequency of Bicycle Commuting: Internet-Based Survey Analysis , 2004 .

[12]  Debbie A. Niemeier,et al.  Specification of a tour-based neighborhood shopping model , 2005 .

[13]  Sean T. Doherty Rules for Assessing Data Quality of Activity-Scheduling Survey Respondents , 2004 .

[14]  Matthew J. Roorda,et al.  Design and Assessment of the Toronto Area Computerized Household Activity Scheduling Survey , 2004 .

[15]  Matthew J. Roorda,et al.  Prototype Model of Household Activity-Travel Scheduling , 2003 .

[16]  Adam Astrid Kemperman,et al.  Predicting the Duration of Theme Park Visitors' Activities: An Ordered Logit Model Using Conjoint Choice Data , 2003 .

[17]  C Blanchard-Zimmerman,et al.  Meeting the intent of ADA in sidewalk cross-slope design. , 2001, Journal of rehabilitation research and development.

[18]  Hai Yang,et al.  Transport bilevel programming problems: recent methodological advances , 2001 .

[19]  E. Miller,et al.  A computerized household activity scheduling survey , 2000 .

[20]  William H. Greene,et al.  LIMDEP version 8.0 : econometric modeling guide , 2002 .

[21]  Joel Freedman,et al.  Synthesis of first practices and operational research approaches in activity-based travel demand modeling , 2007 .

[22]  Abolfazl Mohammadian,et al.  Modeling activity scheduling time horizon: Duration of time between planning and execution of pre-planned activities , 2006 .

[23]  Matthew J. Roorda,et al.  Computerized Household Activity-Scheduling Survey for Toronto, Canada, Area: Design and Assessment , 2004 .

[24]  Moshe Ben-Akiva,et al.  PII: S0965-8564(99)00043-9 , 2000 .

[25]  Abolfazl Mohammadian,et al.  An Activity-Based Microsimulation Model of Travel Demand in the Jakarta Metropolitan Area , 2007 .

[26]  Ryuichi Kitamura,et al.  Micro-simulation of daily activity-travel patterns for travel demand forecasting , 2000 .

[27]  Sean Doherty Interactive Methods for Activity Scheduling Processes , 2002 .

[28]  C. Bhat,et al.  A COMPARISON OF TWO ALTERNATIVE BEHAVIORAL CHOICE MECHANISMS FOR HOUSEHOLD AUTO OWNERSHIP DECISIONS , 1998 .

[29]  Yoram Shiftan,et al.  Practical Approach to Model Trip Chaining , 1998 .

[30]  W. Greene,et al.  计量经济分析 = Econometric analysis , 2009 .