Model Mix Planning and Assembly Sequencing with SAP - APO Automotive Module
暂无分享,去创建一个
[1] B. V. Babu,et al. Multi-objective differential evolution (MODE) for optimization of supply chain planning and management , 2007, 2007 IEEE Congress on Evolutionary Computation.
[2] Kudret Demirli,et al. Fuzzy scheduling of a build-to-order supply chain , 2008 .
[3] Herbert Meyr,et al. Supply chain planning in the German automotive industry , 2004, OR Spectr..
[4] Andrea Bardi,et al. The logistic cycle of the supply chain of the motor vehicle industry: critical issues and pathways of regional development , 2011 .
[5] Sven Spieckermann,et al. A sequential ordering problem in automotive paint shops , 2004 .
[6] M. J. Naude,et al. Supply chain management problems at South African automotive component manufacturers , 2011 .
[7] Andrew Kusiak,et al. Design for Cost: Module-Based Mass Customization , 2007, IEEE Transactions on Automation Science and Engineering.
[8] Henry Aigbedo,et al. An assessment of the effect of mass customization on suppliers' inventory levels in a JIT supply chain , 2007, Eur. J. Oper. Res..
[9] Matthias Amen,et al. Heuristic methods for cost-oriented assembly line balancing: A survey , 2000 .
[10] Haoxun Chen,et al. Multi-objective Supply Chain Optimization: An Industrial Case Study , 2007, EvoWorkshops.
[11] L. Escudero. An inexact algorithm for the sequential ordering problem , 1988 .
[12] W. B. Lee,et al. Knowledge management approach in build-to-order supply chains , 2007, Ind. Manag. Data Syst..
[13] Lionel Amodeo,et al. Comparison of Metaheuristic Approaches for Multi-objective Simulation-Based Optimization in Supply Chain Inventory Management , 2009, EvoWorkshops.
[14] A. Gunasekaran,et al. Build‐to‐order supply chain management: a literature review and framework for development , 2005 .
[15] Alf Kimms,et al. Sequencing JIT Mixed-Model Assembly Lines Under Station-Load and Part-Usage Constraints , 2001, Manag. Sci..