DEVELOPING METHODOLOGY FOR CRADLE TO GRAVE COST PLANNING FOR INDUSTRIALISED BUILDING SYSTEM (IBS) IN MALAYSIA

This paper presents a proposed research methodology undertaken by a researcher to investigate the most accurate and appropriate method to generate a cradle to grave cost planning for Industrialised Building System (IBS) in the Malaysian construction industry. The methodology was intended to bring out accurate results and provide useful sources for the induction of emerging insights relating to the problem identified, which is how the current cost planning used for IBS projects helps in terms of cost control from pre-contract until the demolition of the building. At the end of this research, a proposed cradle to grave cost planning method was produced. To achieve the aims and objectives of this research, both quantitative and qualitative methods were applied. A quantitative research method in the form of a questionnaire survey was conducted to investigate which method is mostly used in preparing cost planning for IBS both from contractors’ and consultants’ point of view. The next stage of data collection was involved in-depth qualitative investigation using face-to face interviews meant to get in-depth views of each cost planning method’s advantages and barriers and what does it need to include to produce an effective cost planning for IBS elements. To complete the triangulation approach, expert group participations and validation were conducted to contribute essential thoughts in producing a comprehensive cradle to grave cost planning method, as well as validating the findings from the research. This method offers alternatives of cost planning and control over the project, and suitable for either IBS or conventional method.

[1]  Srinath Perera,et al.  Collaborative case-based estimating and design , 1998 .

[2]  Farzad Khosrowshahi,et al.  Estimation of project total cost and duration for housing projects in the U.K. , 1996 .

[3]  Eva Sterner,et al.  Life-cycle costing and its use in the Swedish building sector , 2000 .

[4]  Sung Hoon An,et al.  Comparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoning , 2004 .

[5]  Martin Skitmore,et al.  Accuracy in estimating , 1983 .

[6]  Richard Kirkham,et al.  Rethinking whole life cycle cost based design decision making , 2004 .

[7]  Marvin Rausand,et al.  Product safety - principles and practices in a life cycle perspective. , 2009 .

[8]  S J Kirk,et al.  LIFE CYCLE COSTING FOR DESIGN PROFESSIONALS. 2ND REVISED EDITION , 1995 .

[9]  John Kelly,et al.  A whole life costing input tool for surveyors in UK local government , 2005 .

[10]  Napsiah Ismail,et al.  Factors influencing the construction cost of Industrialised Building System (IBS) projects , 2012 .

[11]  H. Paul Barringer,et al.  A Life Cycle Cost Summary , 2003 .

[12]  David G. Woodward,et al.  Life cycle costing—Theory, information acquisition and application , 1997 .

[13]  Kyoungmin Kim,et al.  Approximate cost estimating model for PSC Beam bridge based on quantity of standard work , 2009 .

[14]  Mohamed O. Abd Karim S. and Kho M.Y. The Practice of Life-Cycle Costing (LCC) in the Malaysian Construction Industry - Application during Design Stages , 2007 .