On Scheduling with Ready Times and Due Dates to Minimize Maximum Lateness
暂无分享,去创建一个
An algorithm is developed for sequencing jobs on a single processor in order to minimize maximum lateness, subject to ready times and due dates. The method that we develop could be classified as branch-and-bound. However, it has the unusual feature that a complete solution is associated with each node of the enumeration tree.