A tight flow control for job-shop fabrication lines with finite buffers
暂无分享,去创建一个
[1] Yu-Chi Ho,et al. A gradient technique for general buffer storage design in a production line , 1979 .
[2] Vassilis S. Kouikoglou,et al. An exact discrete-event model and control policies for production lines with buffers , 1991 .
[3] Donald R. Smith,et al. Understanding the fundamentals of Kanban and CONWIP pull systems using simulation , 2001, Proceeding of the 2001 Winter Simulation Conference (Cat. No.01CH37304).
[4] Yu-Chi Ho,et al. Sensitivity analysis and optimization of throughput in a production line with blocking , 1987 .
[5] Michael C. Caramanis,et al. Event-driven model of unreliable production lines with storage , 1988 .
[6] C.. The throughput rate of multistation unreliable production lines , 2003 .
[7] H. Toba. Segment-based approach for real-time reactive rescheduling for automatic manufacturing control , 2000 .
[8] Diomidis Spinellis,et al. A simulated annealing approach for buffer allocation in reliable production lines , 2000, Ann. Oper. Res..
[9] Stanley B. Gershwin. Design and operation of manufacturing systems: the control-point policy , 2000 .
[10] Beth Tibbitts. Flexible simulation of a complex semiconductor manufacturing line using a rule-based system , 1993, IBM J. Res. Dev..
[11] H. T. Papadopoulos,et al. The Throughput of Multistation Production Lines with No Intermediate Buffers , 1995, Oper. Res..
[12] Stanley B. Gershwin,et al. An Efficient Decomposition Method for the Approximate Evaluation of Tandem Queues with Finite Storage Space and Blocking , 1987, Oper. Res..
[13] Bernard J. Schroer,et al. Just-In-Time (JIT), with Kanban, manufacturing system simulation on a microcomputer , 1985 .