A tight flow control for job-shop fabrication lines with finite buffers

We propose a work-in-process (WIP) estimation flow control method which serves as a countermeasure against the throughput degradation problem caused by the redundant blocking time of conventional flow control. This method is based on a scheduling technique of which the most important features are: 1) breaking down the entire schedule into individual lot schedules; 2) lot scheduling to reduce redundant blocking time; and 3) WIP estimation for contiguous finite buffer scheduling. The method, first, schedules operational lots at each equipment unit in a fabrication line by using our scheduling procedure for contiguous finite buffers to satisfy the limit capacity of the buffers. Next, the method estimates the future WIP at each equipment group based on predetermined schedules for performing operations. Finally, the method improves the operation timings by continuously supplying WIP estimation to the scheduling procedure. In an actual liquid crystal display (LCD) fabrication line simulation, we have confirmed that the proposed WIP estimation method is a promising one from the standpoint of the line throughput which we obtained.

[1]  Yu-Chi Ho,et al.  A gradient technique for general buffer storage design in a production line , 1979 .

[2]  Vassilis S. Kouikoglou,et al.  An exact discrete-event model and control policies for production lines with buffers , 1991 .

[3]  Donald R. Smith,et al.  Understanding the fundamentals of Kanban and CONWIP pull systems using simulation , 2001, Proceeding of the 2001 Winter Simulation Conference (Cat. No.01CH37304).

[4]  Yu-Chi Ho,et al.  Sensitivity analysis and optimization of throughput in a production line with blocking , 1987 .

[5]  Michael C. Caramanis,et al.  Event-driven model of unreliable production lines with storage , 1988 .

[6]  C. The throughput rate of multistation unreliable production lines , 2003 .

[7]  H. Toba Segment-based approach for real-time reactive rescheduling for automatic manufacturing control , 2000 .

[8]  Diomidis Spinellis,et al.  A simulated annealing approach for buffer allocation in reliable production lines , 2000, Ann. Oper. Res..

[9]  Stanley B. Gershwin Design and operation of manufacturing systems: the control-point policy , 2000 .

[10]  Beth Tibbitts Flexible simulation of a complex semiconductor manufacturing line using a rule-based system , 1993, IBM J. Res. Dev..

[11]  H. T. Papadopoulos,et al.  The Throughput of Multistation Production Lines with No Intermediate Buffers , 1995, Oper. Res..

[12]  Stanley B. Gershwin,et al.  An Efficient Decomposition Method for the Approximate Evaluation of Tandem Queues with Finite Storage Space and Blocking , 1987, Oper. Res..

[13]  Bernard J. Schroer,et al.  Just-In-Time (JIT), with Kanban, manufacturing system simulation on a microcomputer , 1985 .