Time Series Analysis of ENR Construction Cost Index

Every month, Engineering News-Record (ENR) publishes the construction cost index (CCI), which is a weighted aggregate index of the 20-city average prices of construction activities. Although CCI increases over the long term, it is subject to considerable short-term variations, which make it problematic for cost estimators to prepare accurate bids for contractors or engineering estimates for owner organizations. The ability to predict construction cost trends can result in more-accurate bids and avoid under- or overestimation. This paper summarizes and compares the applicability and predictability of various univariate time series approach for in-sample and out-of-sample forecastings of CCI. It is shown that the seasonal autoregressive integrated moving-average model is the most-accurate time series approach for in-sample forecasting of CCI, while the Holt-Winters exponential smoothing model is the most-accurate time series approach for out-of-sample forecasting of CCI. It is also shown that several time s...

[1]  Peter R. Winters,et al.  Forecasting Sales by Exponentially Weighted Moving Averages , 1960 .

[2]  Garold D. Oberlender,et al.  Predicting Accuracy of Early Cost Estimates using Factor Analysis and Multivariate Regression , 2003 .

[3]  Everette S. Gardner,et al.  Exponential smoothing: The state of the art , 1985 .

[4]  R. M. Skitmore,et al.  A comparative analysis of three macro price forecasting models , 1994 .

[5]  G. Schwarz Estimating the Dimension of a Model , 1978 .

[6]  D. P. Mital,et al.  Time series modelling and forecasting of Singapore property price: an optimal control approach , 1998, 1998 Second International Conference. Knowledge-Based Intelligent Electronic Systems. Proceedings KES'98 (Cat. No.98EX111).

[7]  K. Runeson,et al.  Methodology and method for price-level forecasting in the building industry , 1988 .

[8]  K. Ord Charles Holt's report on exponentially weighted moving averages: an introduction and appreciation , 2004 .

[9]  Patrick Kent Watson,et al.  A Practical Introduction to Econometric Methods: Classical and Modern , 2002 .

[10]  Paul Bowen,et al.  Building price-level forecasting: an examination of techniques and applications , 1987 .

[11]  Ching-Hwang Wang,et al.  Model for forecasting construction cost indices in Taiwan , 1998 .

[12]  Ka Chi Lam,et al.  Prediction of tender price index directional changes , 2000 .

[13]  R. McCaffer,et al.  Predicting the Tender Price of Buildings during Early Design: Method and Validation , 1984 .

[14]  Gwilym M. Jenkins,et al.  Time series analysis, forecasting and control , 1972 .

[15]  Ruey S. Tsay,et al.  Analysis of Financial Time Series: Tsay/Analysis of Financial Time Series , 2005 .

[16]  Trefor P. Williams,et al.  Predicting Changes in Construction Cost Indexes Using Neural Networks , 1994 .

[17]  James M. W. Wong,et al.  Time series forecasts of the construction labour market in Hong Kong: the Box‐Jenkins approach , 2005 .

[18]  R. Fellows Escalation management: Forecasting the effects of inflation on building projects , 1991 .

[19]  Richard A. Davis,et al.  Introduction to time series and forecasting , 1998 .

[20]  D. Dickey,et al.  Testing for unit roots in autoregressive-moving average models of unknown order , 1984 .