Risk management framework for build, operate and transfer (BOT) projects in Kuwait

AbstractSuccessful implementation of build-operate-transfer (BOT), infrastructure projects is dependent on a full and thorough analysis of factors that include social, economic and political, amongst others. Alongside the financially focused evaluations, qualitative factors will also have a strong impact on the project and so require specific techniques for the analysis. This paper presents a new evaluation framework, based on the analytical hierarchy process technique, for use in assessing the most common and significant decision factors relating to risks in BOT projects. Consultations with an expert group identified a series of risk decision factors. The results produced twenty-eight critical Risk Factors, which have a particular impact on the risks of BOT projects. The project risk framework was constructed by classifying the factors into five categories. The framework was successfully validated using a BOT project case study. This research seeks to make a valuable contribution to the field by having d...

[1]  Robert L. K. Tiong RISKS AND GUARANTEES IN BOT TENDER , 1995 .

[2]  Heng Li,et al.  Alternative Concession Model for Build Operate Transfer Contract Projects , 2002 .

[3]  Robert L. K. Tiong,et al.  Competitive advantage of equity in BOT tender , 1995 .

[4]  Malik Ranasinghe,et al.  Private sector participation in infrastructure projects: a methodology to analyse viability of BOT , 1999 .

[5]  Liyin Shen,et al.  APPLICATION OF BOT SYSTEM FOR INFRASTRUCTURE PROJECTS IN CHINA , 1996 .

[6]  Mirioslaw J Skibniewski,et al.  BOT Viability Model for Large-Scale Infrastructure Projects , 2007 .

[7]  Peter E.D. Love,et al.  Public private partnerships: What does the future hold? , 2009 .

[8]  Christopher Findlay,et al.  Financing Public Infrastructure: Darrin Grimsey and Mervyn K Lewis, Public Private Partnerships: The Worldwide Revolution in Infrastructure Provision and Private Finance, Edward Elgar, Cheltenham, 2004 , 2005 .

[9]  A. Akintoye,et al.  The allocation of risk in PPP/PFI construction projects in the UK , 2005 .

[10]  Robert L. K. Tiong Comparative Study of BOT Projects , 1990 .

[11]  Li yin Shen,et al.  Risk Concession Model for Build/Operate/Transfer Contract Projects , 2005 .

[12]  G. A. Miller THE PSYCHOLOGICAL REVIEW THE MAGICAL NUMBER SEVEN, PLUS OR MINUS TWO: SOME LIMITS ON OUR CAPACITY FOR PROCESSING INFORMATION 1 , 1956 .

[13]  A. J. Smith,et al.  Privatized infrastructure : the build operate transfer approach , 1995 .

[14]  M. Loosemore,et al.  Risk allocation in the private provision of public infrastructure , 2007 .

[15]  Luiz Moutinho,et al.  Analytical hierarchy process , 1994 .

[16]  Sid Ghosh,et al.  Identifying and assessing the critical risk factors in an underground rail project in Thailand: a factor analysis approach , 2004 .

[17]  Robert L. K. Tiong,et al.  Impact of Financial Package versus Technical Solution in a BOT Tender , 1995 .

[18]  Brantley Liddle Privatization Decision and Civil Engineering Projects , 1997 .

[19]  S. Levy Build, Operate, Transfer: Paving the Way for Tomorrow's Infrastructure , 2008 .

[20]  Tzvi Raz,et al.  Use and benefits of tools for project risk management , 2001 .

[21]  M. Lewis,et al.  The Governance of Contractual Relationships in PublicPrivate Partnerships , 2004 .

[22]  S. Burcin Kaplanoglu,et al.  Case Study: Izmit Domestic and Industrial Water Supply Build–Operate–Transfer Project , 2004 .

[23]  Mm Kumaraswamy,et al.  BOT-type procurement in Asian mega projects , 2002 .

[24]  Koichi Asatani Introduction to B-ISDN , 1997 .

[25]  Andrew D.F. Price,et al.  Modelling global risk factors affecting construction cost performance , 2003 .

[26]  R. Tiong,et al.  Critical Success Factors in Winning BOT Contracts , 1992 .

[27]  R. Tiong CSFs in Competitive Tendering and Negotiation Model for BOT Projects , 1996 .

[28]  Mohan M. Kumaraswamy,et al.  Build-Operate-Transfer-Type Procurement in Asian Megaprojects , 2002 .

[29]  Stephen O. Ogunlana,et al.  Risk management in build-operate-transfer projects , 2002 .

[30]  Martin Loosemore Risk Management in Projects , 2005 .

[31]  Photios G. Ioannou,et al.  Debt Capacity and Optimal Capital Structure for Privately Financed Infrastructure Projects , 1995 .

[32]  Liyin Shen,et al.  Using bargaining-game theory for negotiating concession period for BOT-type contract , 2007 .

[33]  S. V. Narasimham,et al.  Discussion: CSFs in Competitive Tendering and Negotiation Model for BOT Projects , 1998 .

[34]  Stephen O. Ogunlana,et al.  Selection and application of risk management tools and techniques for build-operate-transfer projects , 2004, Ind. Manag. Data Syst..

[35]  Stephen L. Kajewski,et al.  The public sector's perspective on procuring public works projects ‐ comparing the views of practitioners in Hong Kong and Australia , 2010 .

[36]  Antonio Estache,et al.  World development report 1994 : infrastructure for development , 1994 .

[37]  Anthony D. Songer,et al.  Risk analysis for revenue dependent infrastructure projects , 1997 .

[38]  Edmundas Kazimieras Zavadskas,et al.  Risk assessment of construction projects , 2010 .

[39]  Michael Klein,et al.  Transaction costs in private infrastructure projects - Are they too high? , 1996 .

[40]  Roger Flanagan,et al.  Risk Management and Construction , 1993 .

[41]  Robert L. K. Tiong,et al.  Final Negotiation in Competitive BOT Tender , 1997 .

[42]  Ahmed A. Gab-Allah,et al.  PROBLEMS FACING PARTIES INVOLVED IN BUILD, OPERATE, AND TRANSPORT PROJECTS IN EGYPT , 2002 .

[43]  Seon-Gyoo Kim,et al.  Risk performance indexes and measurement systems for mega construction projects , 2010 .

[44]  S. Meysam Mousavi,et al.  Risk identification and assessment for build-operate-transfer projects: A fuzzy multi attribute decision making model , 2010, Expert Syst. Appl..

[45]  Irem Dikmen Ozdoganm,et al.  A decision support framework for project sponsors in the planning stage of build-operate-transfer (BOT) projects , 2000 .

[46]  Sidney M. Levy,et al.  Build, operate, transfer , 1996 .

[47]  Jeffrey Delmon Water Projects:A Commercial and Contractual Guide , 2001 .

[48]  Tarek Zayed,et al.  Prototype Model for Build-Operate-Transfer Risk Assessment , 2002 .