Contributions of designers to improving buildability and constructability

This paper highlights that design teams should take the lead to enhance the buildability and constructability of their projects. Through a questionnaire survey, the significant factors affecting buildability have been identified and classified into those related to the design process and design outcome, respectively. Results show that efforts in (i) carrying out thorough site and ground investigations prior to design; (ii) coordinating design documents, components, and working sequences; as well as (iii) designing for standardisation, repetition, safety and ease of construction, would enhance buildability and constructability for any given projects. The ANOVA statistical technique has also identified 3 buildability attributes associated with (a) below-ground works on nearby buildings, (b) imports of materials and (c) working space on site, which had statistically significant differences among the perceptions of Clients, Consultants and Contractors.

[1]  Felix T. Uhlik,et al.  Assessment of Constructability Practices among General Contractors , 1998 .

[2]  Simon A. Austin,et al.  Managing value and quality in design , 2003 .

[3]  Willy Sher,et al.  Artificial neural network for the selection of buildable structural systems , 2003 .

[4]  Raykun R. Tan,et al.  On the quality of construction engineering design projects , 1995 .

[5]  Low Sui Pheng,et al.  Integrating buildability in ISO 9000 quality management systems: case study of a condominium project , 2001 .

[6]  Alan Griffith,et al.  Constructability in Building and Engineering Projects , 1995 .

[7]  George Jergeas,et al.  Benefits of Constructability on Construction Projects , 2001 .

[8]  Valerie Francis,et al.  Constructability Strategy for Improved Project Performance , 1999 .

[9]  Stephen Fox,et al.  Constructability rules: guidelines for successful application to bespoke buildings , 2002 .

[10]  Gurth Higgin,et al.  Communications in the building industry : the report of a pilot study , 1965 .

[11]  Vernon Ireland,et al.  The role of managerial actions in the cost, time and quality performance of high-rise commercial building projects , 1985 .

[12]  John Tookey,et al.  The Placing and Management of Contracts for Building and Civil Engineering Work: The Banwell Report (1964) , 2008 .

[13]  Bambang Trigunarsyah Project owners' role in improving constructability of construction projects: an example analysis for Indonesia , 2004 .

[14]  Alan Griffith,et al.  Development of constructability concepts, principles and practices , 1997 .

[15]  Mohd Saleh Jaafar,et al.  Evaluation of the engineer’s personnel’s role in enhancing the project constructability , 1999 .

[16]  Francis Tekyi Edum-Fotwe,et al.  Introduction to Building Procurement Systems , 2002 .

[17]  Rizal Sebastian,et al.  The Interface Between Design and Management , 2005, Design Issues.

[18]  Paul S.H. Poh,et al.  The Singapore buildable design appraisal system: a preliminary review of the relationship between buildability, site productivity and cost. , 1998 .

[19]  J. Masterman An Introduction to Building Procurement Systems , 1990 .

[20]  Claude Bédard,et al.  Collaborative planning and scheduling of interrelated design changes , 2000 .

[21]  David Arditi,et al.  Constructability Analysis in the Design Firm , 2002 .

[22]  Bambang Trigunarsyah A review of current practice in constructability improvement: case studies on construction projects in Indonesia , 2004 .

[23]  Christopher Marsh Building Services Procurement , 2002 .

[24]  Graham Winch,et al.  Benchmarking on-site productivity in France and the UK: a CALIBRE approach , 2001 .

[25]  Albert P. C. Chan,et al.  A comparison of strategies for reducing variations , 1995 .

[26]  Thomas E. Glavinich,et al.  Improving Constructability during Design Phase , 1995 .