Long-term stability of a backfilled room-and-pillar test section at the Buick Mine, Missouri, USA
暂无分享,去创建一个
[1] John Dunnicliff,et al. Geotechnical Instrumentation for Monitoring Field Performance , 1988 .
[2] Henrique Ceotto,et al. Underground mining methods , 2001 .
[3] W. L. Lane,et al. Pillar extraction and rock mechanics at the Doe Run Company in Missouri 1991 to 1999 , 1999 .
[4] A. Fourie,et al. Handbook on Mine FIll , 2005 .
[5] Tom Brady,et al. Underhand Cut and Fill Mining as Practiced in Three Deep Hard Rock Mines in the United States , 2007 .
[6] E. Hoek,et al. Applicability of the geological strength index (GSI) classification for very weak and sheared rock masses. The case of the Athens Schist Formation , 1998 .
[7] P. K. Kaiser,et al. Support of underground excavations in hard rock , 1995 .
[8] W. A. Hustrulid,et al. Underground mining methods : engineering fundamentals and international case studies , 2001 .
[9] D. R. Tesarik,et al. Instrumentation and modeling of the north 140 section of Magmont Mine, Bixby, MO , 1989 .
[10] P. Choquet,et al. Reliability, long-term stability and gage performance of vibrating wire sensors with reference to case histories , 1999 .
[11] P. Mottahed,et al. Ten years of continuous monitoring in a mining panel , 1997 .
[12] Hamid Maleki,et al. Prediction of room closure and stability of panel 1 in the Waste Isolation Pilot Plant , 1997 .
[13] J. P. Henry,et al. Laboratory investigation of the mechanical behaviour of Tournemire shale , 1997 .
[14] D. R. Tesarik,et al. Post-failure behavior of two mine pillars confined with backfill , 2003 .
[15] A. R. Jumikis,et al. Engineering Properties of Rocks , 1969 .
[16] D. R. Tesarik,et al. Stability analysis of a backfilled room-and-pillar mine. Report of investigations/1995 , 1995 .
[17] P. K. Kaiser,et al. Progressive spalling in massive brittle rock , 2000 .