A novel integer programing formulation for scheduling with family setup times on a single machine to minimize maximum lateness
暂无分享,去创建一个
[1] Byong-Hun Ahn,et al. Single facility multi-class job scheduling , 1990, Comput. Oper. Res..
[2] Chris N. Potts,et al. Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and Complexity , 1992 .
[3] Kenneth R. Baker,et al. Solving the single-machine sequencing problem using integer programming , 2010, Comput. Ind. Eng..
[4] W. Hoeffding. Probability Inequalities for sums of Bounded Random Variables , 1963 .
[5] Kenneth R. Baker,et al. Scheduling Groups of Jobs on a Single Machine , 1995, Oper. Res..
[6] Maurice Queyranne,et al. Polyhedral Approaches to Machine Scheduling , 2008 .
[7] Jatinder N. D. Gupta,et al. A review of scheduling research involving setup considerations , 1999 .
[8] E. Balas. On the facial structure of scheduling polyhedra , 1985 .
[9] Whm Henk Zijm,et al. Single-machine scheduling with release dates, due dates and family setup times , 1994 .
[10] Kenneth R. Baker,et al. Minimizing maximum lateness with job families , 2000, Eur. J. Oper. Res..
[11] Gilles Savard,et al. Time-Indexed Formulations and the Total Weighted Tardiness Problem , 2005, INFORMS J. Comput..
[12] Shanlin Yang,et al. Non-identical parallel-machine scheduling research with minimizing total weighted completion times: Models, relaxations and algorithms ☆ , 2009 .
[13] Herbert Hamers,et al. Family sequencing and cooperation , 2013, Eur. J. Oper. Res..
[14] Chris N. Potts,et al. Single machine scheduling with batch set-up times to minimize maximum lateness , 1997, Ann. Oper. Res..
[15] Evripidis Bampis,et al. Approximation schemes for minimizing average weighted completion time with release dates , 1999, 40th Annual Symposium on Foundations of Computer Science (Cat. No.99CB37039).
[16] Harvey M. Wagner,et al. An integer linear‐programming model for machine scheduling , 1959 .
[17] Ahmet B. Keha,et al. Mixed integer programming formulations for single machine scheduling problems , 2009, Comput. Ind. Eng..
[18] Maurice Queyranne,et al. Structure of a simple scheduling polyhedron , 1993, Math. Program..
[19] John L. Bruno,et al. Complexity of Task Sequencing with Deadlines, Set-Up Times and Changeover Costs , 1978, SIAM J. Comput..
[20] Gerhard J. Woeginger,et al. A polynomial‐time approximation scheme for single‐machine sequencing with delivery times and sequence‐independent batch set‐up times , 1998 .
[21] Clyde L. Monma,et al. On the Complexity of Scheduling with Batch Setup Times , 1989, Oper. Res..
[22] Chris N. Potts,et al. Branch and bound algorithms for single-machinescheduling with batch set-up times to minimizetotal weighted completion time , 1998, Ann. Oper. Res..
[23] Edward Anderson,et al. Minimizing flow time on a single machine with job classes and setup times , 1991 .
[24] Ali Allahverdi,et al. The third comprehensive survey on scheduling problems with setup times/costs , 2015, Eur. J. Oper. Res..
[25] Chris N. Potts,et al. Scheduling with batching: A review , 2000, Eur. J. Oper. Res..
[26] Martin W. P. Savelsbergh,et al. Time-Indexed Formulations for Machine Scheduling Problems: Column Generation , 2000, INFORMS J. Comput..
[27] Moshe Dror,et al. Mathematical programming formulations for machine scheduling: A survey , 1991 .
[28] Martin W. P. Savelsbergh,et al. An experimental study of LP-based approximation algorithms for scheduling problems , 1998, SODA '98.
[29] Cheng Wu,et al. Single machine scheduling with sequence-dependent family setups to minimize maximum lateness , 2010, J. Oper. Res. Soc..
[30] Chao-Hsien Pan,et al. A study of integer programming formulations for scheduling problems , 1997, Int. J. Syst. Sci..
[31] Kenneth R. Baker,et al. Lower bounds and algorithms for flowtime minimization on a single machine with set-up times , 2000 .
[32] Jatinder N. D. Gupta,et al. Batch scheduling to minimize maximum lateness , 1997, Oper. Res. Lett..
[33] T. C. Edwin Cheng,et al. The Single Machine Batching Problem with Family Setup Times to Minimize Maximum Lateness is Strongly NP-Hard , 2003, J. Sched..
[34] Stanisław Zdrzałka. Analysis of approximation algorithms for single-machine scheduling with delivery times and sequence independent batch setup times , 1995 .