Early Involvement and Integration in Construction Projects: The Benefits of DfX in Elimination of Wastes
暂无分享,去创建一个
Harri Haapasalo | Aki Aapaoja | Heikki Halttula | H. Haapasalo | Heikki Halttula | A. Aapaoja | Samuli Manninen | Samuli Manninen
[1] Ronald K. Mitchell,et al. Toward a Theory of Stakeholder Identification and Salience: Defining the Principle of who and What Really Counts , 1997 .
[2] Johannes I.M. Halman,et al. Innovation and interorganizational cooperation: a synthesis of literature , 2009 .
[3] Peter E.D. Love,et al. Alliance contracting: adding value through relationship development , 2011 .
[4] S. Dowlatshahi,et al. Implementing early supplier involvement: a conceptual framework , 1998 .
[5] Sanjay Bhasin,et al. Lean viewed as a philosophy , 2006 .
[6] 大野 耐一,et al. Toyota production system : beyond large-scale production , 1988 .
[7] Stefan Olander,et al. Stakeholder impact analysis in construction project management , 2007 .
[8] Henry Mintzberg. Mintzberg on management : inside our strange world of organizations , 1991 .
[9] Karl T. Ulrich,et al. Product Design and Development , 1995 .
[10] Harri Haapasalo,et al. Early Stakeholder Involvement in the Project Definition Phase: Case Renovation , 2013 .
[11] L. Preston,et al. The Stakeholder Theory of the Corporation: Concepts, Evidence, and Implications , 1995 .
[12] Glenn Ballard,et al. The Lean Project Delivery System: An Update , 2008 .
[13] Michael L. Tushman,et al. Information Processing as an Integrating Concept in Organizational Design. , 1978 .
[14] 門田 安弘,et al. Toyota production system : practical approach to production management , 1983 .
[15] Panagiotis Mitropoulos,et al. Management-Driven Integration , 2000 .
[16] Per-Erik Josephson,et al. Slöseri i byggprojekt: behov av förändrat synsätt , 2005 .
[17] Intensitas,et al. Analytical Hierarchy Process , 2017 .
[18] Harri Haapasalo,et al. A Framework for Stakeholder Identification and Classification in Construction Projects , 2014 .
[19] P. Hines,et al. Learning to evolve: A review of contemporary lean thinking , 2004 .
[20] K. Aaltonen,et al. Stakeholder salience in global projects , 2008 .
[21] Kamal M. Al‐Subhi Al‐Harbi,et al. Application of the AHP in project management , 2001 .
[22] Karlos Artto,et al. Organizing in the Context of Global Project-based Firm The Case of Sales-Operations Interface , 2013 .
[23] Nick Rich,et al. The seven value stream mapping tools , 1997 .
[24] Jouni Similä,et al. Industrial Management & Data Systems Managerial view on design for manufacturing , 2017 .
[25] Tuomo Kinnunen,et al. Analyzing Internal Stakeholders’ Salience in Product Development , 2014 .
[26] P. Kuvaja,et al. Benefits of DfX in Requirements Engineering , 2011 .
[27] Bhargav Dave,et al. Collaborative knowledge management—A construction case study , 2009 .
[28] Harri Haapasalo,et al. The Engagement between Knowledge Transfer and Requirements Engineering , 2012 .
[29] Luis F. Alarcón,et al. Assessing the Impacts of Implementing Lean Construction , 2008 .
[30] Clive Thomas Cain. Performance Measurement for Construction Profitability , 2004 .
[31] Arnold M. Wright,et al. Accelerated Product Introductions and Emerging Managerial Accounting Perspectives: Implications for Marketing Managers in the Technology Sector , 1993 .
[32] Seung-Hyun Lee,et al. Identifying Waste: Applications of Construction Process Analysis , 1999 .
[33] Beth A. Bechky,et al. 10 Coordination in Organizations: An Integrative Perspective , 2009 .
[34] Lynda M. Bourne,et al. Project Relationship Management and the Stakeholder Circle , 2010 .
[35] H. Haapasalo,et al. The Contemporaneous use of Building Information Modeling and Relational Project Delivery Arrangements , 2015 .
[36] Lauri Koskela. Making-Do — the Eighth Category of Waste , 2004 .
[37] H. Haapasalo,et al. Virtual Competencies and Knowledge Transfer in Global NPD: A Case Study , 2013 .
[38] J. Liker. The Toyota Way , 2003 .
[39] Pertti Lahdenperä,et al. Making sense of the multi-party contractual arrangements of project partnering, project alliancing and integrated project delivery , 2012 .
[40] Suzanne Wilkinson,et al. Development of a conceptual team integration performance index for alliance projects , 2013 .
[41] Alemu Moges Belay. Design for Manufacturability and Concurrent Engineering for Product Development , 2009 .
[42] Y. Asiedu,et al. Product life cycle cost analysis: State of the art review , 1998 .
[43] Lauri Koskela,et al. Application of the New Production Philosophy to Construction , 1992 .
[44] Sven Bertelsen,et al. Lean Construction: Where Are We and How To Proceed? , 2004, Lean Construction Journal.
[45] James P. Womack,et al. Lean Thinking: Banish Waste and Create Wealth in Your Corporation , 1996 .
[46] G. Howell,et al. Integrated Project Delivery An Example Of Relational Contracting , 2005 .
[47] Thayaparan Gajendran,et al. Using a case study approach to identify critical success factors for alliance contracting , 2014 .
[48] Peter W. G. Morris,et al. Reconstructing Project Management , 2013 .
[49] Robert Owen,et al. Interaction of Lean and Building Information Modeling in Construction , 2010 .
[50] A. V. D. Ven,et al. Determinants of Coordination Modes within Organizations , 1976 .
[51] Yi Min Xie,et al. Overview of alliancing research and practice in the construction industry , 2012 .
[52] James D. Thompson. Organizations in Action: Social Science Bases of Administrative Theory , 1967 .
[53] Jeffrey K. Liker,et al. The Toyota Product Development System: Integrating People, Process And Technology , 2006 .
[54] Andrew R.J. Dainty,et al. The extent of team integration within construction projects , 2006 .
[55] James G. Bralla. Design for Excellence , 1995 .
[56] W. Duncan. A GUIDE TO THE PROJECT MANAGEMENT BODY OF KNOWLEDGE , 1996 .
[57] R. Handfield,et al. Involving Suppliers in New Product Development , 1999 .
[58] Harri Haapasalo,et al. Productivity and Performance Management – Managerial Practices in the Construction Industry , 2012 .
[59] Aminah Robinson Fayek,et al. Risk Management in the Construction Industry Using Combined Fuzzy FMEA and Fuzzy AHP , 2010 .