Extensions to an efficient optimization model for long-term production planning at LKAB's Kiruna Mine
暂无分享,去创建一个
[1] Jaroslav Ramík,et al. Optimization models of production of a coal- mining company , 1997 .
[2] Martin L. Smith. Optimizing short-term production schedules in surface mining: Integrating mine modeling software with AMPL/CPLEX , 1998 .
[3] Erkan Topal,et al. Implementing a Production Schedule at LKAB's Kiruna Mine , 2004, Interfaces.
[4] B. M. Winkler. Mine production scheduling using linear programming and virtual reality , 1998 .
[5] Parag C. Pendharkar. A fuzzy linear programming model for production planning in coal mines , 1997, Comput. Oper. Res..
[6] Robert Underwood,et al. A scheduling algorithm for open pit mines , 1996 .
[7] W. Matthew Carlyle,et al. Underground Planning at Stillwater Mining Company , 2001, Interfaces.
[8] H. G. Daellenbach,et al. Two-phase optimization of coal strategies at a power station , 1984 .
[9] Robert Underwood,et al. A mathematical programming viewpoint for solving the ultimate pit problem , 1998, Eur. J. Oper. Res..
[10] R. V. Ramani,et al. Generalized multiperiod MIP model for production scheduling and processing facilities selection and location , 1986 .
[11] Torgny Almgren,et al. An approach to long range production and development planning with application to the Kiruna Mine, Sweden , 1994 .
[12] Brian W. Kernighan,et al. AMPL: A Modeling Language for Mathematical Programming , 1993 .