Optimal Discrete Rate Adaptation for Distributed Real-Time Systems
暂无分享,去创建一个
[1] Chenyang Lu,et al. Hybrid supervisory utilization control of real-time systems , 2005, 11th IEEE Real Time and Embedded Technology and Applications Symposium.
[2] Efstratios N. Pistikopoulos,et al. An algorithm for multiparametric mixed-integer linear programming problems , 1999, Oper. Res. Lett..
[3] Chenyang Lu,et al. Feedback control real-time scheduling in ORB middleware , 2003, The 9th IEEE Real-Time and Embedded Technology and Applications Symposium, 2003. Proceedings..
[4] Scott A. Brandt,et al. A dynamic quality of service middleware agent for mediating application resource usage , 1998, Proceedings 19th IEEE Real-Time Systems Symposium (Cat. No.98CB36279).
[5] Chenyang Lu,et al. Decentralized utilization control in distributed real-time systems , 2005, 26th IEEE International Real-Time Systems Symposium (RTSS'05).
[6] Daniel P. Siewiorek,et al. On quality of service optimization with discrete QoS options , 1999, Proceedings of the Fifth IEEE Real-Time Technology and Applications Symposium.
[7] John P. Lehoczky,et al. Practical Solutions for QoS-Based Resource Allocation , 1998, RTSS 1998.
[8] John P. Lehoczky,et al. Fixed priority scheduling of periodic task sets with arbitrary deadlines , 1990, [1990] Proceedings 11th Real-Time Systems Symposium.
[9] Jun Sun,et al. Synchronization protocols in distributed real-time systems , 1996, Proceedings of 16th International Conference on Distributed Computing Systems.
[10] Paolo Toth,et al. Knapsack Problems: Algorithms and Computer Implementations , 1990 .
[11] Scott A. Brandt,et al. Flexible Soft Real-Time Processing in Middleware , 2004, Real-Time Systems.
[12] Chenyang Lu,et al. Feedback performance control in software services , 2003 .
[13] Alberto Bemporad,et al. Evaluation of piecewise affine control via binary search tree , 2003, Autom..
[14] Karl-Erik Årzén,et al. Feedback–Feedforward Scheduling of Control Tasks , 2002, Real-Time Systems.
[15] Oscar H. Ibarra,et al. Fast Approximation Algorithms for the Knapsack and Sum of Subset Problems , 1975, JACM.
[16] Daniel P. Siewiorek,et al. A resource allocation model for QoS management , 1997, Proceedings Real-Time Systems Symposium.
[17] Efstratios N. Pistikopoulos,et al. Multiparametric Linear Programming , 2009, Encyclopedia of Optimization.
[18] Giuseppe Lipari,et al. Elastic Scheduling for Flexible Workload Management , 2002, IEEE Trans. Computers.
[19] Alberto Bemporad,et al. Model predictive control based on linear programming - the explicit solution , 2002, IEEE Transactions on Automatic Control.
[20] James W. Layland,et al. Scheduling Algorithms for Multiprogramming in a Hard-Real-Time Environment , 1989, JACM.
[21] Daniel P. Siewiorek,et al. A scalable solution to the multi-resource QoS problem , 1999, Proceedings 20th IEEE Real-Time Systems Symposium (Cat. No.99CB37054).
[22] Mato Baotic,et al. Multi-Parametric Toolbox (MPT) , 2004, HSCC.
[23] John P. Lehoczky,et al. Scalable resource allocation for multi-processor QoS optimization , 2003, 23rd International Conference on Distributed Computing Systems, 2003. Proceedings..
[24] Chang-Gun Lee,et al. Online QoS Optimization Using Service Classes in Surveillance Radar Systems , 2004, Real-Time Systems.
[25] John A. Stankovic,et al. Dynamic end-to-end guarantees in distributed real time systems , 1994, 1994 Proceedings Real-Time Systems Symposium.
[26] Chenyang Lu,et al. Feedback utilization control in distributed real-time systems with end-to-end tasks , 2005, IEEE Transactions on Parallel and Distributed Systems.
[27] Kang G. Shin,et al. QoS negotiation in real-time systems and its application to automated flight control , 1997, Proceedings Third IEEE Real-Time Technology and Applications Symposium.
[28] Katta G. Murty,et al. Computational complexity of parametric linear programming , 1980, Math. Program..
[29] Chen Lee,et al. An Approach for Quality of Service Management , 1998 .
[30] K. Shin,et al. Performance Guarantees for Web Server End-Systems: A Control-Theoretical Approach , 2002, IEEE Trans. Parallel Distributed Syst..
[31] Hideyuki Tokuda,et al. Dynamic QOS Control based on Real-Time Threads , 1993, NOSSDAV.
[32] Chenyang Lu,et al. FC-ORB: A robust distributed real-time embedded middleware with end-to-end utilization control , 2007, J. Syst. Softw..
[33] Sang Hyuk Son,et al. Feedback Control Real-Time Scheduling: Framework, Modeling, and Algorithms* , 2001, Real-Time Systems.
[34] Calton Pu,et al. A feedback-driven proportion allocator for real-rate scheduling , 1999, OSDI '99.
[35] Hector Garcia-Molina,et al. Deadline Assignment in a Distributed Soft Real-Time System , 1997, IEEE Trans. Parallel Distributed Syst..
[36] Sartaj Sahni,et al. Approximate Algorithms for the 0/1 Knapsack Problem , 1975, JACM.