Determining Significant Risks in the Variability between Design-Stage Elemental Cost Plan and Final Tender Sum

AbstractSeveral researches have indicated that pre-tender estimating inaccuracies are significantly influenced by the level of risk information available to estimators. This study first identifies risk factors that influence variability between design-stage elemental cost plan and final tender sum (contract sum) in traditionally procured commercial building projects. It further evaluates the identified risk factors through risk measurement to determine the most significant ones during design development. Project data from New Zealand were obtained through online questionnaire and interview surveys to determine the construction consultants’ perspectives. Responses to the survey were analyzed by using descriptive statistics, risk mean analysis (RMA), degree of risk, coefficient of variation, and Kendall’s coefficient of concordance. A ranking of mean scores of the survey responses enabled the most significant risk factors to be determined. Interviews were analyzed by using thematic and documentary methods t...

[1]  Henry Agboola Odeyinka,et al.  An Assessment of the Accuracy of Quantity Surveyors' Preliminary Cost Estimates in Nigeria , 2003 .

[2]  Albert P.C. Chan,et al.  A fuzzy model for evaluating risk impacts on variability between contract sum and final account in government-funded construction projects , 2015 .

[3]  Robert Eadie,et al.  Building Information Modelling Adoption: An Analysis of the Barriers of Implementation , 2014 .

[4]  Yean Yng Ling,et al.  Improving the accuracy estimates of building of approximate projects , 2001 .

[5]  Adwoa Boadua Yirenkyi-Fianko,et al.  An analysis of risk management in practice: the case of Ghana’s construction industry , 2015 .

[6]  Sherif Ali Mohtady Mohamed,et al.  Factors Affecting the Accuracy of Pre-Tender Cost Estimates in the Gaza Strip , 2013 .

[7]  Steven J. Taylor Introduction to qualitative research methods , 1975 .

[8]  Neill Morrison,et al.  The accuracy of quantity surveyors' cost estimating , 1984 .

[9]  Martin Skitmore,et al.  The accuracy of pre-tender building price forecasts: An analysis of USA data , 2000 .

[10]  Alfredo del Caño,et al.  Integrated Methodology for Project Risk Management , 2002 .

[11]  Jim Smith,et al.  Building Cost Planning for the Design Team , 2015 .

[12]  Robert J. Chapman,et al.  The controlling influences on effective risk identification and assessment for construction design management , 2001 .

[13]  Nicholas Chileshe,et al.  An evaluation of risk factors impacting construction projects in Ghana , 2012 .

[14]  Henry Odeyinka,et al.  Modelling risk impacts on the budgeted cost of traditionally procured building projects , 2007 .

[15]  Garold D. Oberlender,et al.  Predicting Accuracy of Early Cost Estimates using Factor Analysis and Multivariate Regression , 2003 .

[16]  William Gibson,et al.  Working with Qualitative Data , 2009, QMiP Bulletin.

[17]  Robert Eadie,et al.  An Exploration of Theoretical Concepts and Methods for Assessing Risk Impacts on the Variability between Contract Sum and Final Account in Design and Build Projects , 2012 .

[18]  Paul. Olomolaiye,et al.  Critical success criteria for mass house building projects in developing countries , 2008 .

[19]  Srinath Perera,et al.  An evaluation of the budgetary reliability of bills of quantities , 2009 .

[20]  Akintola Akintoye,et al.  Analysis of factors influencing project cost estimating practice , 2000 .

[21]  Patrick X.W. Zou,et al.  Understanding the key risks in construction projects in China , 2007 .

[22]  Li Liu,et al.  Improving Cost Estimates of Construction Projects Using Phased Cost Factors , 2007 .

[23]  A. H. Boussabaine,et al.  Critical determinants of construction tendering costs: Quantity surveyors’ standpoint , 2005 .

[24]  Søren L. Buhl,et al.  Underestimating Costs in Public Works Projects: Error or Lie? , 2002, 1303.6604.

[25]  C. A. Moser,et al.  Survey Methods in Social Investigation , 1958 .

[26]  Robert Weatherup,et al.  Assessing risk impacts on the variability between tender sum and final account. , 2010 .

[27]  J. Perry,et al.  RISK AND ITS MANAGEMENT IN CONSTRUCTION PROJECTS. , 1985 .

[28]  Ajibade Ayodeji Aibinu,et al.  The accuracy of pre‐tender building cost estimates in Australia , 2008 .