Forecast horizon aggregation in integer autoregressive moving average (INARMA) models
暂无分享,去创建一个
[1] F. Petropoulos,et al. Improving forecasting by estimating time series structural components across multiple frequencies , 2014 .
[2] M. Mohammadipour. Intermittent demand forecasting with integer autoregressive moving average models , 2013 .
[3] Dong Tang,et al. Managing finished-goods inventory under capacitated delayed differentiation , 2011 .
[4] L. Duncan,et al. Forecasting intermittent demand: a comparative study , 2009, J. Oper. Res. Soc..
[5] Peter Neal,et al. MCMC for Integer‐Valued ARMA processes , 2007 .
[6] Ruijun Bu,et al. Maximum likelihood estimation of higher‐order integer‐valued autoregressive processes , 2008 .
[7] S. Disney,et al. On variance amplification in a three-echelon supply chain with minimum mean square error forecasting , 2022 .
[8] Robert C. Jung,et al. Coherent forecasting in integer time series models , 2006 .
[9] José Rui Figueira,et al. An interactive decision support system for an aggregate production planning model based on multiple criteria mixed integer linear programming , 2006 .
[10] B. McCabe,et al. Asymptotic properties of CLS estimators in the Poisson AR(1) model , 2005 .
[11] J. Boylan,et al. The accuracy of intermittent demand estimates , 2005 .
[12] Integer-valued moving average modelling of the number of transactions in stocks , 2010 .
[13] K. Man,et al. Linear prediction of temporal aggregates under model misspecification , 2004 .
[14] Brendan McCabe,et al. Forecasting discrete valued low count time series , 2004 .
[15] Maria Eduardo da Silva,et al. Difference Equations for the Higher‐Order Moments and Cumulants of the INAR(1) Model , 2004 .
[16] Christian Gourieroux,et al. Heterogeneous INAR(1) model with application to car insurance , 2004 .
[17] In-Bong Kang,et al. Multi-period forecasting using different models for different horizons: an application to U.S. economic time series data , 2003 .
[18] Paulo Teles,et al. The Use of Aggregate Time Series in Testing for Gaussianity , 2002 .
[19] Andrew W. Howard,et al. FORECASTING FOR THE ORDERING AND STOCK- HOLDING OF CONSUMABLE SPARE PARTS , 2002 .
[20] Kurt Brännäs,et al. GENERALIZED INTEGER-VALUED AUTOREGRESSION , 2001 .
[21] Kurt Brännäs,et al. A New Approach to Modelling and Forecasting Monthly Guest Nights in Hotels , 2001 .
[22] Massimiliano Marcellino,et al. Some Consequences of Temporal Aggregation in Empirical Analysis , 1999 .
[23] Stephen F. Witt,et al. Forecasting industrial production using structural time series models , 1998 .
[24] Alain Latour,et al. Existence and Stochastic Structure of a Non‐negative Integer‐valued Autoregressive Process , 1998 .
[25] G. C. Tiao,et al. Robustness of maximum likelihood estimates for multi-step predictions: The exponential smoothing case , 1993 .
[26] T. Nijman,et al. Temporal Aggregation of GARCH Processes. , 1993 .
[27] Li Yuan,et al. THE INTEGER‐VALUED AUTOREGRESSIVE (INAR(p)) MODEL , 1991 .
[28] E. McKenzie,et al. Some ARMA models for dependent sequences of poisson counts , 1988, Advances in Applied Probability.
[29] Franz C. Palm,et al. Predictive accuracy gain from disaggregate sampling in ARIMA models , 1990 .
[30] Mohamed Alosh,et al. FIRST‐ORDER INTEGER‐VALUED AUTOREGRESSIVE (INAR(1)) PROCESS , 1987 .
[31] Andrew Harvey,et al. Estimating Missing Observations in Economic Time Series , 1984 .
[32] Fw Fred Steutel,et al. Discrete analogues of self-decomposability and stability , 1979 .
[33] K. Brewer. Some consequences of temporal aggregation and systematic sampling for ARMA and ARMAX models , 1973 .
[34] Takeshi Amemiya,et al. The Effect of Aggregation on Prediction in the Autoregressive Model , 1972 .
[35] D. Cox. Prediction by Exponentially Weighted Moving Averages and Related Methods , 1961 .
[36] M. H. Quenouille. Discrete autoregressive schemes with varying time-intervals , 1958 .