The EAWAG Bio-P module for activated sludge model No. 3.
暂无分享,去创建一个
L Rieger | H Siegrist | W Gujer | G Koch | W. Gujer | H. Siegrist | L. Rieger | G. Koch | M Kühni | M. Kühni
[1] Tove A. Larsen,et al. The implementation of biokinetics and conservation principles in ASIM , 1995 .
[2] Max Maurer,et al. Kinetics of biologically induced phosphorus precipitation in waste-water treatment , 1999 .
[3] H. Siegrist,et al. Microbial competition for the organic substrates and its impact on EBPR systems under conditions of changing carbon feed , 1999 .
[4] P. Hugenholtz,et al. Identification of Polyphosphate-Accumulating Organisms and Design of 16S rRNA-Directed Probes for Their Detection and Quantitation , 2000, Applied and Environmental Microbiology.
[5] C. M. Hooijmans,et al. IMPACT OF EXCESSIVE AERATION ON BIOLOGICAL PHOSPHORUS REMOVAL FROM WASTEWATER , 1998 .
[6] L Rieger,et al. Calibration and validation of an ASM3-based steady-state model for activated sludge systems--part II: Prediction of phosphorus removal. , 2001, Water research.
[7] Tomonori Matsuo,et al. Modelling glycogen storage and denitrification capability of microorganisms in enhanced biological phosphate removal processes , 1995 .
[8] T. Mino,et al. Anaerobic substrate uptake by the enhanced biological phosphorus removal activated sludge treating real sewage , 1996 .
[9] J J Heijnen,et al. Stoichiometric model of the aerobic metabolism of the biological phosphorus removal process , 1994, Biotechnology and bioengineering.
[10] Peter Reichert,et al. Concepts underlying a computer program for the identification and simulation of aquatic systems , 1994 .
[11] J. Heijnen,et al. Microbiology and biochemistry of the enhanced biological phosphate removal process , 1998 .
[12] Hansruedi Siegrist,et al. Reduction of biomass decay rate under anoxic and anaerobic conditions , 1999 .
[13] S. H. Møller,et al. A multi-disciplinary danish research programme on rainbow trout (Oncorhynchus mykiss) farming , 1994 .
[14] Willi Gujer,et al. Calibration and validation of activated sludge model no. 3 for Swiss municipal wastewater , 2000 .
[15] Modelling of the anaerobic reactor in a biological phosphate removal process , 1996 .
[16] J. J. Heijnen,et al. Modelling biological phosphorus and nitrogen removal in a full scale activated sludge process , 1999 .
[17] H Siegrist,et al. Calibration and validation of an ASM3-based steady-state model for activated sludge systems--part I: Prediction of nitrogen removal and sludge production. , 2001, Water research.