Time completion for various dispatching rules in job shops
暂无分享,去创建一个
[1] D. Quade. Using Weighted Rankings in the Analysis of Complete Blocks with Additive Block Effects , 1979 .
[2] Michael P. Hottenstein,et al. Expediting in Job-Order-Control Systems: A Simulation Study , 1970 .
[3] A. R. Jonckheere,et al. A DISTRIBUTION-FREE k-SAMPLE TEST AGAINST ORDERED ALTERNATIVES , 1954 .
[4] William L. Maxwell,et al. Theory of scheduling , 1967 .
[5] James K. Weeks. A Simulation Study of Predictable Due-Dates , 1979 .
[6] C. T. Baker,et al. Simulation of a Simplified Job Shop , 1960 .
[7] Douglas A. Elvers,et al. The Sensitivity of the Relative Effectiveness of Job Shop Dispatching Rules with Respect to Various Arrival Distributions , 1974 .
[8] John Aitchison,et al. THE GENERALIZATION OF PROBIT ANALYSIS TO THE CASE OF MULTIPLE RESPONSES , 1957 .
[9] James K. Weeks,et al. A Methodology for Assigning Minimum Cost Due-Dates , 1977 .
[10] Charles A. Holloway,et al. Job Shop Scheduling with Due Dates and Variable Processing Times , 1974 .
[11] Jon K. Wilbrecht,et al. The Influence of Setup Time on Job Shop Performance , 1969 .
[12] James C. Goodwin,et al. Overtime usage in a job shop environment , 1978 .
[13] R. T. Nelson. Labor and Machine Limited Production Systems , 1967 .
[14] R. M. Hodgson,et al. JOB SHOPS SCHEDULING WITH DUE DATES , 1967 .
[15] William L. Maxwell,et al. Network Dispatching by the Shortest-Operation Discipline , 1962 .
[16] Samuel Eilon,et al. Due dates in job shop scheduling , 1976 .
[17] A. J. Clewett,et al. Introduction to sequencing and scheduling , 1974 .
[18] Donald C Carroll,et al. Heuristic sequencing of single and multiple component jobs. , 1965 .