Simulation and production planning for manufacturing cells
暂无分享,去创建一个
David S. Cochran | Shahram Taj | James W. Duda | Jochen Linck | J. Duda | D. Cochran | S. Taj | J. Linck
[1] Charles T. Mosier,et al. Analysis of group technology scheduling heuristics , 1984 .
[2] T. J. Greene,et al. A review of cellular manufacturing assumptions, advantages and design techniques , 1984 .
[3] Avijit Banerjee,et al. A simulation study of some maintenance policies in a group technology shop , 1987 .
[4] 新郷 重夫,et al. A study of the Toyota production system from an industrial engineering viewpoint , 1989 .
[5] Ali Gharbi,et al. An algorithm for the cell formation and the machine selection problems in the design of a cellular manufacturing system , 1997 .
[6] Michael Donald Charles. The impact of machine and cell design on volume flexibility and capacity planning , 1997 .
[7] Barbara B. Flynn. Critical machines preventive maintenance policies for group technology shops , 1989 .
[8] Urban Wemmerlöv,et al. CELLULAR MANUFACTURING AT 46 USER PLANTS : IMPLEMENTATION EXPERIENCES AND PERFORMANCE IMPROVEMENTS , 1997 .
[9] 大野 耐一,et al. Toyota production system : beyond large-scale production , 1988 .
[10] John B. Kidd,et al. Toyota Production System , 1993 .
[11] James P. Womack,et al. Lean Thinking: Banish Waste and Create Wealth in Your Corporation , 1996 .
[12] Farzad Mahmoodi,et al. Impactof maintenance policies onthe performance of manufacturing cells , 1997 .