Schedule-dependent evolution of site layout planning
暂无分享,去创建一个
[1] Iris D. Tommelein,et al. Sightplan: an expert system that models and augments human decision-making for designing construction site layouts , 1989 .
[2] Abraham Warszawski,et al. Optimizing the Location of Facilities on a Building Site , 1973 .
[3] Laurence Tianruo Yang,et al. Fuzzy Logic with Engineering Applications , 1999 .
[4] Chung-Wei Feng,et al. Using genetic algorithms to solve construction time-cost trade-off problems , 1997 .
[5] Lotfi A. Zadeh,et al. Fuzzy Sets , 1996, Inf. Control..
[6] Iris D. Tommelein,et al. Dynamic layout planning using a hybrid incremental solution method , 1999 .
[7] Tarek Hegazy,et al. A Hybrid AL‐Based System for Site Layout Planning in Construction , 2001 .
[8] F. A. Meier,et al. Application of fuzzy decision-making in facilities layout planning , 1996 .
[9] I-Cheng Yeh. Construction-Site Layout Using Annealed Neural Network , 1995 .
[10] David E. Goldberg,et al. Genetic Algorithms in Search Optimization and Machine Learning , 1988 .
[11] Peter E.D. Love,et al. Site-Level Facilities Layout Using Genetic Algorithms , 1998 .
[12] Iris D. Tommelein,et al. Interactive Dynamic Layout Planning , 1993 .
[13] D. E. Goldberg,et al. Genetic Algorithms in Search , 1989 .