FRIB Project: Moving to Production Phase

The Facility of Rare Isotope Beams (FRIB) project was presented in SRF2013 [1]. This paper reports the progressed situation of this project since SRF2013. FRIB project is now moving to production phase. FRIB superconducting RF (SRF) linac project and challenges are presented. This paper address the status of the SRF hardware production, SRF infrastructure status and plans for ramping to full production, and also focus on information that can be relevant for future large proton/ion SRF linac projects.

[1]  Ethan Metzgar,et al.  Low-Beta SRF Cavity Processing and Testing Facility for the Facility for Rare Isotope Beams at Michigan State University , 2015 .

[2]  F. Marti,et al.  Heavy Ion Strippers , 2012 .

[3]  S. K. Chandrasekaran,et al.  Magnetic Shield Material Characterization for the Facility for Rare Isotope Beams' Cryomodules , 2015, IEEE Transactions on Applied Superconductivity.

[4]  Kenji Saito,et al.  Validation of Local Magnetic Shielding for FRIB Using a Prototype Cryomodule , 2015 .

[5]  A. Facco,et al.  SUPERCONDUCTING RESONATORS DEVELOPMENT FOR THE FRIB AND ReA LINACS AT MSU: RECENT ACHIEVEMENTS AND FUTURE GOALS* , 2012 .

[6]  K. Elliott,et al.  FACED ISSUES IN REA3 QUARTER-WAVE RESONATORS AND THEIR SUCCESSFUL RESOLUTION* , 2013 .

[7]  A. Facco,et al.  The FRIB Project at MSU , 2013 .

[8]  Ying Xu,et al.  Low-Beta Cryomodule Design Optimized for Large-Scale Linac Installations , 2013 .

[9]  S. Chandrasekaran,et al.  QUALITY ASSURANCE AND ACCEPTANCE TESTING OF NIOBIUM MATERIAL FOR USE IN THE CONSTRUCTION OF THE FACILITY FOR RARE ISOTOPE BEAMS (FRIB) AT MICHIGAN STATE UNIVERSITY (MSU) , 2014 .

[10]  Paul Gibson,et al.  THE FRIB PROJECT - ACCELERATOR CHALLENGES AND PROGRESS* , 2012 .

[11]  Rl Hauser,et al.  Construction and Performance of In Situ Heat Flux Transducers , 1985 .

[12]  E. E. Burkhardt,et al.  Superconducting Solenoid Package Prototyping for FRIB SRF Linac , 2015 .

[13]  Chris Compton,et al.  Production Status of SRF Cavities for the Facility for Rare Isotope Beams (FRIB) Project , 2015 .

[14]  A. Facco,et al.  Virtual Welding as a Tool for Superconducting Cavity Coarse Tuning , 2015 .

[15]  Ethan Metzgar,et al.  SRF Cavity Processing and Chemical Etching Development for the FRIB Linac , 2015 .

[16]  D.Miller Quality Assurance and Acceptance Testing of Niobium Material for Use in the Construction of the Facility for Rare Isotope Beams (FRIB) at Michigan State University (MSU) , 2013 .

[17]  Paul Gibson,et al.  SRF Highbay Technical Infrastructure for FRIB Production at Michigan State University , 2014 .

[18]  Yan Zhang,et al.  SRF Developments at MSU for FRIB , 2013 .