State of art of optimization methods for assembly line design
暂无分享,去创建一个
Brahim Rekiek | Alexandre Dolgui | Alain Delchambre | Antoneta I. Bratcu | A. Delchambre | A. Dolgui | A. Bratcu | B. Rekiek
[1] Heungsoon Felix Lee,et al. A line-balancing strategy for designing flexible assembly systems , 1991 .
[2] Michael J. Magazine,et al. Assembly line balancing as generalized bin packing , 1982, Oper. Res. Lett..
[3] Alain Delchambre,et al. A genetic algorithm for bin packing and line balancing , 1992, Proceedings 1992 IEEE International Conference on Robotics and Automation.
[4] D. Whitney,et al. A mathematical programming procedure for equipment selection and system evaluation in programmable assembly , 1979, 1979 18th IEEE Conference on Decision and Control including the Symposium on Adaptive Processes.
[5] Brian J. Carnahan,et al. Incorporating physical demand criteria into assembly line balancing , 2001 .
[6] We-Min Chow,et al. Assembly Line Design: Methodology and Applications , 1990 .
[7] Armin Scholl,et al. Balancing and Sequencing of Assembly Lines , 1995 .
[8] Alexandre Dolgui,et al. Stability radius of the optimal assembly line balance with fixed cycle time , 2001, ETFA 2001. 8th International Conference on Emerging Technologies and Factory Automation. Proceedings (Cat. No.01TH8597).
[9] William W. White,et al. Letter to the Editor---Comments on a Paper by Bowman , 1961 .
[10] Viorel Mnzu,et al. Assignment stochastic algorithm in multi-product assembly lines , 1997, Proceedings of the 1997 IEEE International Symposium on Assembly and Task Planning (ISATP'97) - Towards Flexible and Agile Assembly and Manufacturing -.
[11] C. L. Moodie,et al. A HEURISTIC METHOD OF ASSEMBLY LINE BALANCING FOR ASSUMPTIONS OF CONSTANTOR VARIABLE WORK ELEMENT TIMES , 1964 .
[12] Yeongho Kim,et al. Genetic algorithms for assembly line balancing with various objectives , 1996 .
[13] S. Sahu,et al. Stochastic assembly line balancing using simulated annealing , 1994 .
[14] A. Delchambre,et al. Applying the equal piles problem to balance assembly lines , 1999, Proceedings of the 1999 IEEE International Symposium on Assembly and Task Planning (ISATP'99) (Cat. No.99TH8470).
[15] Fayez F. Boctor,et al. A Multiple-rule Heuristic for Assembly Line Balancing , 1995 .
[16] George L. Nemhauser,et al. An Algorithm for the Line Balancing Problem , 1964 .
[17] Ming-Jong Yao,et al. A line-balance-based capacity planning procedure for series-type robotic assembly line , 1993 .
[18] Y. G. Kim,et al. A Heuristic Method for Assembly Line Balancing of Large-Sized Product , 1991 .
[19] Kathryn E. Stecke,et al. An integrated design support method for flexible assembly systems , 1996 .
[20] Peter A. Pinto,et al. Assembly Line Balancing with Processing Alternatives: An Application , 1983 .
[21] E. H. Bowman. Assembly-Line Balancing by Linear Programming , 1960 .
[22] Gregory Levitin,et al. Genetic algorithm for assembly line balancing , 1995 .
[23] Gürsel A. Süer,et al. Designing parallel assembly lines , 1998 .
[24] Brahim Rekiek,et al. Ordering variants and simulation in multi-product assembly lines , 1998 .
[25] Earl David Sacerdoti,et al. A Structure for Plans and Behavior , 1977 .
[26] Behnam Malakooti,et al. A knowledge-based system for solving multi-objective assembly line balancing problems , 1996 .
[27] A. L. Arcus,et al. COMSOAL: a computer method of sequencing operations for assembly lines , 1965 .
[28] James R. Jackson,et al. A Computing Procedure for a Line Balancing Problem , 1956 .
[29] O. Akira. Computer-aided assembly process planning with resource assignment , 1993 .
[30] Ilker Baybars,et al. A survey of exact algorithms for the simple assembly line balancing , 1986 .
[31] E. Lenz,et al. RALB – A Heuristic Algorithm for Design and Balancing of Robotic Assembly Lines , 1993 .
[32] Antoneta Iuliana Bratcu,et al. Modeling and Analysis of Self-Balancing Manufacturing Lines as Hybrid Dynamic Systems , 2001 .
[33] Avraham Shtub,et al. An assembly chart oriented assembly line balancing approach , 1990 .
[34] Stephen C. Graves,et al. Equipment selection and task assignment for multiproduct assembly system design , 1988 .
[35] Anton V. Eremeev,et al. A Genetic Algorithm for the Allocation of Buffer Storage Capacities in a Production Line with Unreliable Machines , 2002, J. Math. Model. Algorithms.
[36] Emanuel Falkenauer,et al. A hybrid grouping genetic algorithm for bin packing , 1996, J. Heuristics.
[37] Donald D. Eisenstein,et al. A Production Line that Balances Itself , 1996, Oper. Res..
[38] Ihsan Sabuncuoglu,et al. Assembly line balancing using genetic algorithms , 2000, J. Intell. Manuf..
[39] C. Ramos,et al. Multi-agent simulation for balancing of assembly lines , 1999, Proceedings of the 1999 IEEE International Symposium on Assembly and Task Planning (ISATP'99) (Cat. No.99TH8470).
[40] Akira Okano. Computer-aided assembly process planning with resource assignment , 1993, [1993] Proceedings IEEE International Conference on Robotics and Automation.
[41] Ram Rachamadugu,et al. Improving the equality of workload assignments in assembly lines , 1991 .
[42] Jonathan F. Bard,et al. Assembly line balancing with parallel workstations and dead time , 1989 .
[43] Stephen C. Graves,et al. An Integer Programming Procedure for Assembly System Design Problems , 2011, Oper. Res..
[44] Alessandro Agnetis,et al. Concurrent operations assignment and sequencing for particular assembly problems in flow lines , 1997, Ann. Oper. Res..
[45] William V. Gehrlein,et al. A comparative evaluation of heuristic line balancing techniques , 1986 .
[46] Alain Delchambre,et al. Computer-aided choice of assembly methods and selection of equipment in production line design , 1999 .
[47] Soumen Ghosh,et al. A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems , 1989 .
[48] Michal Tzur,et al. Design of flexible assembly line to minimize equipment cost , 2000 .
[49] V. V. Vinod,et al. A genetic algorithm for assembly line balancing , 1996 .
[50] Youssef Harrath,et al. Une approche de programmation lineaire pour la conception des lignes de transfert , 2001 .
[51] Patrick R. McMullen,et al. Using simulated annealing to solve a multiobjective assembly line balancing problem with parallel workstations , 1998 .