Integrating inventory control and capacity management at a maintenance service provider

In this paper, we study the capacity flexibility problem of a maintenance service provider, who is running a repair shop and is responsible for the availability of numerous specialized systems which contain a critical component that is prone to failure. Upon a critical component failure, the component is sent to the repair shop and the service provider is responsible for the repair as well as the down-time costs resulting from the system unavailability. In order to decrease the down-time costs, the repair shop keeps an inventory for the critical components, such that a failed critical component can be replaced with a spare one immediately, if it is available. The component inventory stock level and the repair shop capacity level decisions have to be taken jointly by the service provider. The shop floor manager resorts to two different capacity modes in order to make use of capacity flexibility. First one is the single-level capacity mode, in which the capacity level is fixed and is the only capacity related decision. The best results in this mode serve as a reference to the two-level capacity mode, in which there are low (permanent) and high (permanent plus contingent) capacity levels. In this mode, the permanent capacity is always available in the shop, whereas the deployment of the contingent capacity is decided at the start of each period based on the number of components waiting to be repaired in the shop. The relevant capacity decisions of this mode are the permanent and contingent capacity levels, the period length and the states (in terms of number of failed components waiting) where the contingent capacity is deployed. We develop quantitative models based on queuing theory that integrate the inventory level decision with the capacity related decisions for the repair shop, in each of the two capacity modes, in order to minimize the total cost rate of the service provider. Our numerical results suggest that two-level capacity mode can bring substantial savings compared to the best fixed capacity mode and these savings are mostly resulting from lower repair shop capacity usage. Moreover, we find that the system, in most cases, chooses the shortest period length possible, indicating the overarching importance of a fast response to the system state. The system switches to the high capacity mode if the spare part stock is just one or two, then it uses a quite high contingent capacity level, in order to avoid out of stock. If contingent capacity costs are high, system chooses a high level of permanent capacity to prevent frequent capacity switches.

[1]  Tayfur Altiok,et al.  Performance analysis of manufacturing systems , 1996 .

[2]  Gary D. Scudder,et al.  Spares stocking policies for repairable items with dependent repair times , 1982 .

[3]  Peter W. Glynn,et al.  Managing Capacity and Inventory Jointly in Manufacturing Systems , 2002, Manag. Sci..

[4]  J. Will M. Bertrand,et al.  Periodic capacity management under a lead-time performance constraint , 2013, OR Spectr..

[5]  Amit Gupta,et al.  Steady‐state approximation of a multiechelon multi‐indentured repairable‐item inventory system with a single repair facility , 1993 .

[6]  Geert-Jan van Houtum,et al.  Capacitated two-indenture models for repairable item systems , 2001 .

[7]  Rogelio Oliva,et al.  Managing the transition from products to services , 2003, International Journal of Service Industry Management.

[8]  Stanley B. Gershwin,et al.  Production and Subcontracting Strategies for Manufacturers with Limited Capacity and Volatile Demand , 2004, Ann. Oper. Res..

[9]  Nima Safaei,et al.  Workforce-constrained maintenance scheduling for military aircraft fleet: a case study , 2011, Ann. Oper. Res..

[10]  J. Ben Atkinson,et al.  Modeling and Analysis of Stochastic Systems , 1996 .

[11]  John A. Buzacott,et al.  Stochastic models of manufacturing systems , 1993 .

[12]  J. Will M. Bertrand,et al.  Flexible hiring in a make to order system with parallel processing units , 2013, Ann. Oper. Res..

[13]  L. Sennott Stochastic Dynamic Programming and the Control of Queueing Systems , 1998 .

[14]  Sem C. Borst,et al.  Queues with Workload-Dependent Arrival and Service Rates , 2004, Queueing Syst. Theory Appl..

[15]  G. J. Feeney,et al.  The S-1, S Inventory Policy Under Compound Poisson Demand , 1966 .

[16]  Edieal J. Pinker,et al.  Contingent Labor Contracting Under Demand and Supply Uncertainty , 2001, Manag. Sci..

[17]  C. C. Holt,et al.  Planning Production, Inventories, and Work Force. , 1962 .

[18]  Yael Perlman,et al.  Setting expediting repair policy in a multi-echelon repairable-item inventory system with limited repair capacity , 2001, J. Oper. Res. Soc..

[19]  Craig C. Sherbrooke,et al.  Optimal Inventory Modeling of Systems , 1992 .

[20]  Joseph M. Milner,et al.  Supply chain capacity and outsourcing decisions: the dynamic interplay of demand and supply uncertainty , 2002 .

[21]  Richard M. Soland,et al.  A Closed Queueing Network Model for Multi-Echelon Repairable Item Provisioning. , 1983 .

[22]  Osman Alp,et al.  Tactical capacity management under capacity flexibility , 2008 .

[23]  Michael C. Fu,et al.  Models for multi-echelon repairable item inventory systems with limited repair capacity , 1997 .

[24]  G. Reuter,et al.  Spectral theory for the differential equations of simple birth and death processes , 1954, Philosophical Transactions of the Royal Society of London. Series A, Mathematical and Physical Sciences.

[25]  Robert M. Fuhrer,et al.  Coordinating Investment, Production, and Subcontracting , 1999 .

[26]  Matthieu van der Heijden,et al.  Trade-off between inventory and repair capacity in spare part networks , 2003, J. Oper. Res. Soc..

[27]  S. Christian Albright,et al.  Markovian multiechelon repairable inventory system , 1988 .

[28]  John A. Muckstadt,et al.  Analysis and Algorithms for Service Parts Supply Chains , 2008 .

[29]  Martin L. Puterman,et al.  Markov Decision Processes: Discrete Stochastic Dynamic Programming , 1994 .

[30]  Steven A. Lippman,et al.  Applying a New Device in the Optimization of Exponential Queuing Systems , 1975, Oper. Res..

[31]  T. Stern Approximations of Queue Dynamics and Their Application to Adaptive Routing in Computer Communication Networks , 1979, IEEE Trans. Commun..

[32]  Sherwin Rosen,et al.  Chapter 12 The theory of equalizing differences , 1986 .

[33]  Edieal J. Pinker,et al.  Optimizing the use of contingent labor when demand is uncertain , 2003, Eur. J. Oper. Res..

[34]  Marcel F. Neuts,et al.  Matrix-geometric solutions in stochastic models - an algorithmic approach , 1982 .

[35]  J Jaap Wessels,et al.  Diagnosing order planning performance at a navy maintenance and repair organization, using logistic regression , 2009 .

[36]  D. Haas The coordination of initial stock and flexible manpower in repairable item systems , 1995 .

[37]  Michael C. Fu,et al.  Monotone Optimal Policies for a Transient Queueing Staffing Problem , 2000, Oper. Res..

[38]  Osman Alp,et al.  Coordinated Logistics: Joint Replenishment with Capacitated Transportation for a Supply Chain , 2014 .