An improved iterated greedy algorithm for distributed robotic flowshop scheduling with order constraints

[1]  MengChu Zhou,et al.  Scheduling Dual-Objective Stochastic Hybrid Flow Shop With Deteriorating Jobs via Bi-Population Evolutionary Algorithm , 2020, IEEE Transactions on Systems, Man, and Cybernetics: Systems.

[2]  Hing Kai Chan,et al.  A modified genetic algorithm approach for scheduling of perfect maintenance in distributed production scheduling , 2009, Eng. Appl. Artif. Intell..

[3]  Michel Gourgand,et al.  Scheduling multiple robots in a no-wait re-entrant robotic flowshop , 2012 .

[4]  Liang Gao,et al.  A multi-objective hot-rolling scheduling problem in the compact strip production , 2019, Applied Mathematical Modelling.

[5]  Thomas Stützle,et al.  A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem , 2007, Eur. J. Oper. Res..

[6]  Felix T.S. Chan,et al.  A hybrid genetic algorithm for production and distribution , 2005 .

[7]  Shuo Yang,et al.  Cost-efficient inter-robot delivery for resource-constrained and interdependent multi-robot schedules , 2019, International Journal of Advanced Robotic Systems.

[8]  Ling Wang,et al.  A distributed permutation flowshop scheduling problem with the customer order constraint , 2019, Knowl. Based Syst..

[9]  Marcelo Seido Nagano,et al.  An Iterated Greedy approach to integrate production by multiple parallel machines and distribution by a single capacitated vehicle , 2019, Swarm Evol. Comput..

[10]  Carlos García-Martínez,et al.  Iterated greedy for the maximum diversity problem , 2011, Eur. J. Oper. Res..

[11]  Ik Sun Lee,et al.  Minimizing total tardiness for the order scheduling problem , 2013 .

[12]  Victor Fernandez-Viagas,et al.  The distributed permutation flow shop to minimise the total flowtime , 2018, Comput. Ind. Eng..

[13]  Jun-Ho Lee,et al.  Three-machine flow shop scheduling with overlapping waiting time constraints , 2019, Comput. Oper. Res..

[14]  Pandu R. Tadikamalla,et al.  Bicriteria hierarchical optimization of two-machine flow shop scheduling problem with time-dependent deteriorating jobs , 2014, Eur. J. Oper. Res..

[15]  Chengbin Chu,et al.  Multi-degree cyclic scheduling of two robots in a no-wait flowshop , 2005, IEEE Transactions on Automation Science and Engineering.

[16]  Panos M. Pardalos,et al.  Green manufacturing: Order acceptance and scheduling subject to the budgets of energy consumption and machine launch , 2020 .

[17]  Liang Gao,et al.  Effective metaheuristics for scheduling a hybrid flowshop with sequence-dependent setup times , 2017, Appl. Math. Comput..

[18]  James D. Blocher,et al.  The customer order lead‐time problem on parallel machines , 1996 .

[19]  Raymond Chiong,et al.  An improved iterated greedy algorithm with a Tabu-based reconstruction strategy for the no-wait flowshop scheduling problem , 2015, Appl. Soft Comput..

[20]  Jose M. Framiñan,et al.  New approximate algorithms for the customer order scheduling problem with total completion time objective , 2017, Comput. Oper. Res..

[21]  Rubén Ruiz,et al.  The distributed permutation flowshop scheduling problem , 2010, Comput. Oper. Res..

[22]  Jian-Jun Wang,et al.  Single-machine scheduling problems with precedence constraints and simple linear deterioration , 2015 .

[23]  Peiyong Duan,et al.  KMOEA: A Knowledge-Based Multiobjective Algorithm for Distributed Hybrid Flow Shop in a Prefabricated System , 2022, IEEE Transactions on Industrial Informatics.

[24]  Yue Yuan,et al.  An imperialist competitive algorithm with memory for distributed unrelated parallel machines scheduling , 2019, Int. J. Prod. Res..

[25]  Korhan Karabulut,et al.  A hybrid iterated greedy algorithm for total tardiness minimization in permutation flowshops , 2016, Comput. Ind. Eng..

[26]  Feng Cao,et al.  Discrete differential evolution algorithm for distributed blocking flowshop scheduling with makespan criterion , 2018, Eng. Appl. Artif. Intell..

[27]  Chin-Chia Wu,et al.  Using heuristic and iterative greedy algorithms for the total weighted completion time order scheduling with release times , 2019, Swarm Evol. Comput..

[28]  Pandu R. Tadikamalla,et al.  Two-machine flow shop scheduling with deteriorating jobs: minimizing the weighted sum of makespan and total completion time , 2015, J. Oper. Res. Soc..

[29]  Sara Hatami,et al.  The Distributed Assembly Permutation Flowshop Scheduling Problem , 2013 .

[30]  J. Christopher Beck,et al.  A two-stage coupled algorithm for an integrated maintenance planning and flowshop scheduling problem with deteriorating machines , 2015, J. Sched..

[31]  Joseph Y.-T. Leung,et al.  An iterated greedy algorithm for total flow time minimization in unrelated parallel batch machines with unequal job release times , 2019, Eng. Appl. Artif. Intell..

[32]  George Q. Huang,et al.  Manufacturing synchronization in a hybrid flowshop with dynamic order arrivals , 2019, J. Intell. Manuf..

[33]  Jose M. Framiñan,et al.  Effective constructive heuristics and meta-heuristics for the distributed assembly permutation flowshop scheduling problem , 2019, Appl. Soft Comput..

[34]  Min Huang,et al.  An effective metaheuristic algorithm for flowshop scheduling with deteriorating jobs , 2018, J. Intell. Manuf..

[35]  Quan-Ke Pan,et al.  Iterated Greedy methods for the distributed permutation flowshop scheduling problem , 2019, Omega.

[36]  Peter Nielsen,et al.  Metaheuristic algorithms for balancing robotic assembly lines with sequence-dependent robot setup times , 2019, Applied Mathematical Modelling.

[37]  Yael Edan,et al.  Collaborative reinforcement learning for a two-robot job transfer flow-shop scheduling problem , 2016 .

[38]  Hakan Gultekin,et al.  Cyclic scheduling of parts and robot moves in m-machine robotic cells , 2018, Comput. Oper. Res..

[39]  Liang Gao,et al.  Effective heuristics and metaheuristics to minimize total flowtime for the distributed permutation flowshop problem , 2019, Expert Syst. Appl..

[40]  Ahmed Azab,et al.  An improved model and novel simulated annealing for distributed job shop problems , 2015 .

[41]  Xavier Tort-Martorell,et al.  An iterated greedy algorithm for solving the total tardiness parallel blocking flow shop scheduling problem , 2019, Expert Syst. Appl..

[42]  Eugene Levner,et al.  A faster algorithm for 2-cyclic robotic scheduling with a fixed robot route and interval processing times , 2011, Eur. J. Oper. Res..

[43]  Quan-Ke Pan,et al.  Hybrid Artificial Bee Colony Algorithm for a Parallel Batching Distributed Flow-Shop Problem With Deteriorating Jobs , 2020, IEEE Transactions on Cybernetics.

[44]  Can Akkan,et al.  The two-machine flowshop total completion time problem: Improved lower bounds and a branch-and-bound algorithm , 2004, Eur. J. Oper. Res..

[45]  Eugene Levner,et al.  On the existence of dominating 6-cyclic schedules in four-machine robotic cells , 2018, Eur. J. Oper. Res..

[46]  Quan-Ke Pan,et al.  A Hybrid Iterated Greedy Algorithm for a Crane Transportation Flexible Job Shop Problem , 2022, IEEE Transactions on Automation Science and Engineering.

[47]  I. Osman,et al.  Simulated annealing for permutation flow-shop scheduling , 1989 .

[48]  Shuai Zhang,et al.  Combining Extended Imperialist Competitive Algorithm with a Genetic Algorithm to Solve the Distributed Integration of Process Planning and Scheduling Problem , 2017 .

[49]  Junqing Li,et al.  Improved Artificial Immune System Algorithm for Type-2 Fuzzy Flexible Job Shop Scheduling Problem , 2021, IEEE Transactions on Fuzzy Systems.

[50]  Thomas Stützle,et al.  An Iterated Greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectives , 2008, Eur. J. Oper. Res..

[51]  Rubén Ruiz,et al.  A scatter search algorithm for the distributed permutation flowshop scheduling problem , 2014, Eur. J. Oper. Res..

[52]  Yang Zhang,et al.  The order scheduling problem of product-service system with time windows , 2019, Comput. Ind. Eng..

[53]  M. Fatih Tasgetiren,et al.  A discrete artificial bee colony algorithm for the multi-objective flexible job-shop scheduling problem with maintenance activities , 2014 .

[54]  Jian Gao,et al.  An efficient tabu search algorithm for the distributed permutation flowshop scheduling problem , 2013 .

[55]  Zhixiong Li,et al.  Solving Scheduling Problem in a Distributed Manufacturing System Using a Discrete Fruit Fly Optimization Algorithm , 2019, Energies.

[56]  Sai Ho Chung,et al.  An adaptive genetic algorithm with dominated genes for distributed scheduling problems , 2005, Expert Syst. Appl..

[57]  Marcelo Seido Nagano,et al.  A branch-and-bound method to minimize the makespan in a permutation flow shop with blocking and setup times , 2017 .

[58]  Deming Lei,et al.  An artificial bee colony with division for distributed unrelated parallel machine scheduling with preventive maintenance , 2020, Comput. Ind. Eng..

[59]  Shih-Wei Lin,et al.  Minimising makespan in distributed permutation flowshops using a modified iterated greedy algorithm , 2013 .