Flow Assurance Issues Related to Flexible Riser and Pipeline System Configuration
暂无分享,去创建一个
[1] James P. Brill,et al. An Experimental Study on Downward Slug Flow in Inclined Pipes , 1996 .
[2] J. P. Brill,et al. Experimental Study of Severe Slugging in a Two-Phase-Flow Pipeline - Riser Pipe System , 1980 .