Abstract The problem of water production is one of the major technical, environmental, and economical issues associated with oil and gas production. The main goal of this study is to prepare a reservoir numerical simulator with emphasis on water coning. The study mostly involves the numerical simulation of water coning and includes proposed correlations in the literature. The computer program included four distinct modules to calculate: critical or maximum allowable oil rate, water breakthrough time, well performance after water coning take palaces, and water coning simulation. Flow equations of water and oil were discretized and numerically solved for two-dimensional coordinates. The implicit scheme was used to calculate unknown pressures of any grid block. For calculation of water saturation, explicit scheme was used. Real field data of a well in southwest Iran was put into the program and critical rate, water breakthrough time, well performance after water coning, and water coning simulation of reservoir were determined. The authors found that the results of correlations are very far from the reality. On the other hand, numerical simulation shows good agreement with real production data. In addition, it was observed that the present production rate of this well would result in rapid water coning.
[1]
A. Garder,et al.
Mechanics of Two Immiscible Fluids in Porous Media
,
1954
.
[2]
Solomon O. Inikori.
Numerical study of water coning control with Downhole Water Sink (DWS) completions in vertical and horizontal wells
,
2002
.
[3]
M. Kuo.
A simplified method for water coning predictions
,
1983
.
[4]
D. P. Sobocinski,et al.
A Correlation for Predicting Water Coning Time
,
1965
.
[5]
M. F. Hawkins,et al.
Applied Petroleum Reservoir Engineering
,
1991
.
[6]
S. Joshi,et al.
Horizontal Well Technology
,
1991
.
[7]
P. Rae,et al.
New Insights into Water Control - A Review of the State of the Art
,
2002
.
[8]
R. D. Sydansk,et al.
A Strategy for Attacking Excess Water Production
,
2003
.