Triple-level opportunistic maintenance policy for leasehold service network of multi-location production lines
暂无分享,去创建一个
Tangbin Xia | Ying Zhu | Shichang Du | Lifeng Xi | Guojin Si | L. Xi | Shichang Du | Tangbin Xia | Guojin Si | Yinghua Zhu
[1] Ming Jian Zuo,et al. Selective maintenance for multi-state series-parallel systems under economic dependence , 2014, Reliab. Eng. Syst. Saf..
[2] Xia Peng,et al. Transient analysis of maintenance intervention of continuous multi-unit systems , 2008 .
[3] Nacima Labadie,et al. On the combined maintenance and routing optimization problem , 2016, Reliab. Eng. Syst. Saf..
[4] Xiaojun Zhou,et al. Preventive maintenance modeling for multi-component systems with considering stochastic failures and disassembly sequence , 2015, Reliab. Eng. Syst. Saf..
[5] Refik Güllü,et al. Optimal inventory and pricing policies for remanufacturable leased products , 2011 .
[6] Brian A. Weiss,et al. The present status and future growth of maintenance in US manufacturing: results from a pilot survey , 2016, Manufacturing review.
[7] Tangbin Xia,et al. Recent advances in prognostics and health management for advanced manufacturing paradigms , 2018, Reliab. Eng. Syst. Saf..
[8] Tangbin Xia,et al. Dynamic Opportunistic Maintenance Scheduling for Series Systems Based on Theory of Constraints (TOC)–VLLTW Methodology , 2017 .
[9] Raik Stolletz,et al. Branch-and-price approaches for the Multiperiod Technician Routing and Scheduling Problem , 2017, Eur. J. Oper. Res..
[10] Dragan Banjevic,et al. Optimum inspection interval for a system under periodic and opportunistic inspections , 2012 .
[11] Marcelo Hazin Alencar,et al. Delay-time inspection model with dimensioning maintenance teams: A study of a company leasing construction equipment , 2015, Comput. Ind. Eng..
[12] Elise Miller-Hooks,et al. Scheduling technicians for planned maintenance of geographically distributed equipment , 2007 .
[13] Jun Ni,et al. Estimation of active maintenance opportunity windows in Bernoulli production lines , 2017 .
[14] Ming Liu,et al. A branch and bound algorithm for single-machine production scheduling integrated with preventive maintenance planning , 2013 .
[15] Hui-Chiung Lo,et al. Joint determination of lease period and preventive maintenance policy for leased equipment with residual value , 2011, Comput. Ind. Eng..
[16] Tangbin Xia,et al. Production-driven opportunistic maintenance for batch production based on MAM-APB scheduling , 2015, Eur. J. Oper. Res..
[17] N. Gebraeel,et al. Lease-oriented opportunistic maintenance for multi-unit leased systems under product-service paradigm , 2017 .
[18] Sai Ho Chung,et al. Optimization of system reliability in multi-factory production networks by maintenance approach , 2009, Expert Syst. Appl..
[19] Ruey Huei Yeh,et al. Optimal preventive maintenance policy for leased equipment using failure rate reduction , 2009, Comput. Ind. Eng..
[20] Miguel Angel Sanz-Bobi,et al. Profit-maximization generation maintenance scheduling through bi-level programming , 2018, Eur. J. Oper. Res..
[21] Zineb Simeu-Abazi,et al. Optimisation of distributed maintenance: Modelling and application to the multi-factory production , 2011, Reliab. Eng. Syst. Saf..
[22] Xiaojun Zhou,et al. Dynamic maintenance decision-making for series-parallel manufacturing system based on MAM-MTW methodology , 2012, Eur. J. Oper. Res..
[23] Zhigang Tian,et al. Condition based maintenance optimization for multi-component systems using proportional hazards model , 2011, Reliab. Eng. Syst. Saf..
[24] Dirk Van Oudheusden,et al. The Multiconstraint Team Orienteering Problem with Multiple Time Windows , 2010, Transp. Sci..
[25] Frank Meisel,et al. Workforce routing and scheduling for electricity network maintenance with downtime minimization , 2013, Eur. J. Oper. Res..
[26] Fariborz Jolai,et al. A multi-agent approach to the integrated production scheduling and distribution problem in multi-factory supply chain , 2018, Appl. Soft Comput..
[27] Xiaojun Zhou,et al. Multi-phase preventive maintenance policy for leased equipment , 2015 .
[28] Christophe Bérenguer,et al. Dynamic grouping maintenance with time limited opportunities , 2013, Reliab. Eng. Syst. Saf..
[29] Kamran S. Moghaddam. Multi-objective preventive maintenance and replacement scheduling in a manufacturing system using goal programming , 2013 .
[30] D. N. Prabhakar Murthy,et al. Optimal periodic preventive maintenance policy for leased equipment , 2006, Reliab. Eng. Syst. Saf..
[31] Nidhal Rezg,et al. Maintenance strategy for leased equipment , 2013, Comput. Ind. Eng..