An automatic scheduling approach: building information modeling-based onsite scheduling for panelized construction

Panelized/modular construction is increasingly adopted within the industry as a primary construction method, with in-plant fabrication and on-site assembly as two of the main processes. Each of these two processes involves a different emphasis regarding productivity improvement: for in-plant fabrication, manufacturing process management is the main focus, while, for on-site assembly, scheduling and management of assembly operations are of particular interest. This paper proposes a generic approach by which to generate the on-site schedule automatically based on a building information model (BIM), considering the structural supporting and topological relationships among building elements, as well as knowledge of steel panel construction. The BIM model is developed in an Autodesk Revit environment, based on which precedence relationships of elements are derived automatically, and is utilized to perform the on-site schedule through the Autodesk Revit Application Programming Interface (API). The generated schedule results are exported into Microsoft Project for further analysis, such as resource leveling. A case example is provided to demonstrate and validate the methodology. This paper explores the implementation of BIM, with the scheduling of panelized construction as the focus. This research lays the foundation for further implementation of BIM using Autodesk Revit.

[1]  Hyunjoo Kim,et al.  Generating construction schedules through automatic data extraction using open BIM (building information modeling) technology , 2013 .

[2]  Charles M. Eastman,et al.  Building Information Modeling (BIM) and Safety: Automatic Safety Checking of Construction Models and Schedules , 2013 .

[3]  Daniel Castro-Lacouture,et al.  BIM-enabled Integrated Optimization Tool for LEED Decisions , 2009 .

[4]  David K. H. Chua,et al.  PDM++: Planning Framework from a Construction Requirements Perspective , 2011 .

[5]  Yong K. Cho,et al.  BIM-Integrated Sustainable Material and Renewable Energy Simulation , 2010 .

[6]  Saad H.S. Al-Jibouri,et al.  BIM approach for automated drafting and design for modular construction manufacturing , 2012 .

[7]  David A. Duce,et al.  Early stage multi-level cost estimation for schematic BIM models , 2012 .

[8]  Bauke de Vries,et al.  Generation of a construction planning from a 3D CAD model , 2007 .

[9]  Amr A. Oloufa,et al.  Algorithms for automated deduction of topological information , 2005 .

[10]  Tao Cheng,et al.  Real-time resource location data collection and visualization technology for construction safety and activity monitoring applications , 2013 .

[11]  Zhen-Zhong Hu,et al.  BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies , 2011 .

[12]  David K. H. Chua,et al.  Automated construction sequencing and scheduling from functional requirements , 2013 .