A dynamic control approach for energy-efficient production scheduling on a single machine under time-varying electricity pricing
暂无分享,去创建一个
Byung Do Chung | Seok Gi Lee | Hyun Woo Jeon | Jaeyeon Chang | B. Chung | H. Jeon | Seokgi Lee | J. Chang
[1] Stephan Biller,et al. Energy-Efficient Production Systems Through Schedule-Based Operations , 2013, IEEE Transactions on Automation Science and Engineering.
[2] Shijin Wang,et al. Bi-objective optimization of a single machine batch scheduling problem with energy cost consideration , 2016 .
[3] Russell C. Eberhart,et al. A new optimizer using particle swarm theory , 1995, MHS'95. Proceedings of the Sixth International Symposium on Micro Machine and Human Science.
[4] Vittaldas V. Prabhu,et al. Nonlinear dynamics in distributed arrival time control of heterarchical manufacturing systems , 1999, IEEE Trans. Control. Syst. Technol..
[5] Björn Johansson,et al. Discrete event simulation to generate requirements specification for sustainable manufacturing systems design , 2009, PerMIS.
[6] Ada Che,et al. An efficient greedy insertion heuristic for energy-conscious single machine scheduling problem under time-of-use electricity tariffs , 2016 .
[7] Ming Lu,et al. Resource-constrained critical path analysis based on discrete event simulation and particle swarm optimization , 2008 .
[8] John W. Sutherland,et al. Scheduling on a single machine under time-of-use electricity tariffs , 2016, Ann. Oper. Res..
[9] Yassine Ouazene,et al. Machine and production scheduling under electricity time varying prices , 2016, 2016 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM).
[10] Vittaldas V. Prabhu. Performance of real-time distributed arrival time control in heterarchical manufacturing systems , 2000 .
[11] Toon De Pessemier,et al. A generic method for energy-efficient and energy-cost-effective production at the unit process level , 2016 .
[12] Gary D. Scudder,et al. Sequencing with Earliness and Tardiness Penalties: A Review , 1990, Oper. Res..
[13] Mehmet Bayram Yildirim,et al. A framework to minimise total energy consumption and total tardiness on a single machine , 2008 .
[14] Adriana Giret,et al. Energy-efficient scheduling for a flexible flow shop using an improved genetic-simulated annealing algorithm , 2013 .
[15] Joaquín B. Ordieres Meré,et al. Optimizing the production scheduling of a single machine to minimize total energy consumption costs , 2014 .
[16] Mehmet Fatih Tasgetiren,et al. Particle swarm optimization algorithm for single machine total weighted tardiness problem , 2004, Proceedings of the 2004 Congress on Evolutionary Computation (IEEE Cat. No.04TH8753).
[17] Hyun Woo Jeon,et al. Measuring variability on electrical power demands in manufacturing operations , 2016 .
[18] Janet M. Twomey,et al. Operational methods for minimization of energy consumption of manufacturing equipment , 2007 .
[19] Mehmet Bayram Yildirim,et al. Single-Machine Sustainable Production Planning to Minimize Total Energy Consumption and Total Completion Time Using a Multiple Objective Genetic Algorithm , 2012, IEEE Transactions on Engineering Management.
[20] Vittaldas V. Prabhu,et al. Energy-aware feedback control for production scheduling and capacity control , 2015 .